TECHNICAL CONSULTANT OF MINISTRY OF PUBLIC WORKS FOR FLOOD PROTECTION PROJECTS IN SEVERAL PLACES INSIDE GREECE TERRITORY.

Country: GREECE ,   Year: 2006 - 2009 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Construction Supervision Services, Storm Water Networks and Flood prevention

view more

RFP

Until today, there have been serious problems created by flooding. The prioritization of solutions was based primarily on the size of the problems that appear. Z&A through this study, developed flood management models which will provide a convenient tool for prioritization in particular as regards access to funding from E.U. resources. The project included the following: (a) selection of important streams to be included in the management plan, (b) appropriate mapping of relevant catchments, (c) description of the necessary studies for each stream (flood plain, hydraulic studies, etc). Registration of flood protection works or/and settlement in obstructing of streams and (d) proposals on necessary land use changes to achieve the flood protection goals. The projects that were supervised by Z&A were the following:1. “Stabilization of natural slopes and arrangement of river bed of Pamisos stream in Mouzaki Municipality, Karditsa Perfecture”, 2. “Arrangement works on Saint George stream of Dramiziotis river in Trikala Prefecture” 3. “Recreation and environmental protection of Dipotamia river in Kastoria Prefecture” 4. “Arrangement works on Baggo stream of Anthiriotis river in Karditsa Prefecture” 5. “Flood protection works on river Asopos in East Attica Prefecture”.



EOI

Z&A through this study, developed flood management models which will provide a convenient tool for prioritization in particular as regards access to funding from E.U. resources. The project included the following: (a) selection of important streams, (b) appropriate mapping of relevant catchments, (c) description of the necessary studies for each stream (flood plain, hydraulic studies, etc). Registration of flood protection works or/and settlement in obstructing of streams and (d) proposals on necessary land use changes to achieve the flood protection goals. The projects that were supervised by Z&A were the following:1. “Stabilization of natural slopes and arrangement of river bed of Pamisos stream in Mouzaki Municipality, Karditsa Perfecture”, 2. “Arrangement works on Saint George stream of Dramiziotis river in Trikala Prefecture” 3. “Recreation and environmental protection of Dipotamia river in Kastoria Prefecture” 4. “Arrangement works on Baggo stream of Anthiriotis river in Karditsa Prefecture” 5. “Flood protection works on river Asopos in East Attica Prefecture”.



DETAILED DESIGN OF WORKS NECESSARY FOR THE ENVIRONMENTAL PROTECTION OF KOTYCHI LAGOON, ELIA PREFECTURE, PELOPONESSE, SOUTH GREECE

Country: GREECE ,   Year: 2006 - 2006 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Water Resources Management

view more

RFP

Soil loss using RUSLE from the Kotychi basin was estimated using GIS software resulting in a spatial representation which enabled targeting of particular streams and areas of high contribution to the lagoon's sedimentation problem. The targeting of areas informed the design of specific hydraulic works to allow the diversion of freshwater into the lagoon during low flows while at the same time diverting away sediment-laden floodwaters during the rainy season. This arrangement helps in the management of the lagoon's salinity levels and at the same time provides relief from excessive sedimentation.



EOI

The main objective was to protect the lagoon from sedimentation. Soil loss using RUSLE from the Kotychi basin was estimated using GIS software resulting in a spatial representation defining areas of high contribution to the lagoon's sedimentation problem. Specific hydraulic works were designed to allow the diversion of freshwater into the lagoon during low flows while at the same time diverting away sediment-laden floodwaters during the rainy season.



WATER RESOURCES MANAGEMENT OF ACHELOOS RIVER AND MODIFICATIONS OF THE ENVIROMENTAL IMPACT ASSESEMENT STUDY FOR THE DIVERSION OF THE RIVER

Country: GREECE ,   Year: 2006 - 2006 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Water Resources Management

view more

RFP

The study was carried out in four (4) parts as follows: Part A: "Water Potential" examines the natural availability of water in the Acheloos river basin, Part B: "Water Needs" examines water demand from domestic water supply, irrigation, industry and livestock as well as tourism demand. Also the future demand was assessed based on proposed projects and future development. Part C: "Environmental Issues" where the environmental impacts of the Acheloos diversion were analysed and Part D: "Management Model", where a water management model was configured and calibrated and used to assess the water resource system under different scenarios of water use. The project aims at integrated water resources management of the area of interest and the development of the appropriate management tools. It was elaborated in order to assist the Ministry of Public Works in the implementation of the Water Framework Directive (2000/60). The project includes the following 1) Collection of all the relevant information, 2) Development of an integrated database and presentation of all the relevant data on maps (GIS), 3) Recording of all activities related to water use, 4) Water Demand assessments, 5) Use of simulation software, 6) Analysis of developing projects in the greater area
7) Development of a management model, 8) Gathering of economic information, 9) Development and evaluation of an Economic Model.



EOI

The project aims at integrated water resources management of the area of interest and the development of the appropriate management tools in order to assist the Ministry of Public Works in the implementation of the Water Framework Directive (2000/60). The project includes the following: data collection, development of GIS, water demand assessment, modeling, economic analysis, proposed projects.



DETAILED DESIGN STUDY FOR THE ALLIGNMENT AND REGULATION OF THE PIKRODAFNI STREAM, AGIOS DIMITRIOS MUNICIPALITY, ATHENS, GREECE

Country: GREECE ,   Year: 2004 - 2009 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Storm Water Networks and Flood prevention

view more

RFP

This study concerned the detailed design for the arrangement of the Pikrodafni stream from Ag. Dimitriou Avenue to Vouliagmenis Avenue (1.813 m long).



EOI

This study concerned the detailed design for the realignment of the Pikrodafni stream from Ag. Dimitriou Avenue to Vouliagmenis Avenue (1.813 m long).



FEASIBILITY, PRELIMINARY AND DETAILED DESIGN STUDY ON THE TRANSPORT AND DISTRIBUTION OF WATER FROM RIVER NESTOS TO THE PLAINS XANTHI AND KOMOTINI

Country: GREECE ,   Year: 2004 - 2008 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Irrigation

view more

RFP

The scope of the project is the management of the water resources of the Nestos River catchment. The target is to transfer and distribute irrigation water using the available surface waters and protect the underground resources. The WRM study collected all the available water data to establish the water balance of Nestos river catchment and determine the available quantities for irrigation, hydropower generation and environmental flow requirements. The feasibility study involved a total area of more than 100,000 ha and included also the feasibility design of four dams. Following the above proposals, the Ministry assigned the preliminary design of the water supply and distribution network for the irrigation of Xanthi plain from Nestos river. The total length of the water supply system was approximately 155 km with diameters from D2000 to D400. The area under study was approximately 30,500 ha. Following the preliminary design for the total network of the Xanthi plain irrigation scheme, the Ministry assigned the detailed design of the water supply system for the irrigation of approximately 5,730 ha. The distribution network was also designed.



EOI

The scope of the project is the management of the ground water in the valleys of Ksanthi and Komotini by using the water from Nestos River. All required quantities for irrigation, hydropower and environmental flow were estimated. The feasibility study involved a total area of 100,000 ha, 30,000ha in Ksanthi and included also the feasibility design of four dams. The preliminary and the detailed design of the water supply and distribution network for the irrigation of Xanthi plain covered 5,730 ha.



COMPLETION OF HYDRAULIC STUDIES IN THE NEW HIGH SPEED RAILWAY LINE BETWEEN TOWNS KIATO AND PATRA, PELOPONNESE, GREECE (I.D. 440)

Country: GREECE ,   Year: 2004 - 2009 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Storm Water Networks and Flood prevention

view more

RFP

The detailed design of the water drainage system of the railway line , along with the service road drainage system, the flood protection system from surrounding catchment areas with the necessary hydraulic structures (ditches, culverts, etc). The contract also involved the restoration of the existing irrigation networks. All the above studies were applied to sections from STA. 0+000 to STA. 20+000, STA. 40+000 to STA. 92+500 and STA. 111+500 to STA. 113+000 of the new railway line.



EOI

The detailed design of the water drainage system of the railway line, along with the service road drainage system, the flood protection system from surrounding catchment areas with the necessary hydraulic structures (ditches, culverts, etc). The contract also involved the restoration of the existing irrigation networks. All the above studies were applied to sections from STA. 0+000 to STA. 20+000, STA. 40+000 to STA. 92+500 and STA. 111+500 to STA. 113+000 of the new railway line.



DETAILED DESIGN OF A WWTP INSTALLATION IN SARAKAKIS INDUSTRIAL AREA

Country: GREECE ,   Year: 2004 - 2004 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Sewage and Wastewater

view more

RFP

A separate WWTP installation for disposal and treatment of industrial waste water was designed at the Sarakakis Industrial Area, in Athens.The object of this study involved full hydraulic and structural analysis, calculations, the relevant geotechnical study, the detailed design of the WWTP and preparation of the tender documents. Construction supervision was implemented through out the total construction period and after the completion of the project, initial testing was carried on. WWTP installation was implemented at the backside of the main building of Sarakakis Bro. S.A. and designed to accommodate the higher organic strength and solids content in the water. The installation was designed to serve the 650 employees of the company, one truck painting factory and one truck repair workshop.



EOI

A separate WWTP installation for disposal and treatment of industrial waste water was designed at the Sarakakis Industrial Area, in Athens.The object of this study involved full hydraulic and structural analysis, calculations, the relevant geotechnical study, the detailed design of the WWTP and preparation of the tender documents. Construction supervision was implemented through out the total construction period and after the completion of the project, initial testing was carried on.



TECHNICAL CONSULTANT FOR ASSISTANCE OF SERVICE IN THE PLANNING, STUDIES AND CONSTRUCTION OF WORKS FOR WATER SUPPLY OF ATHENS AND OTHER WORKS

Country: GREECE ,   Year: 2004 - 2010 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Water Supply & Water Distribution

view more

RFP

The contract involved the following studies and services for the water supply modernization of Athens network:
1) Increase the technical and institutional capacity of the Client in managing the water supply system of the greater Athens area, consisting of an aqueduct of about 300 km long, 2) Upgrading, modeling and redesigning of the Unified Aqueduct of Athens, 3) Development of the Water Supply Master Plan of the Greater Area of Athens 4) Feasibility study for the completion of the aqueduct Marathona – Yliki – Mornos (section Klidi – Dafnoula), 5) Feasibility study for the additional aqueduct from the exit of Kithaironas tunnel up to Acharnes D2000, 6) Completion of the detailed study of the last part of the repaired chlorination aqueduct in Helidonou area and construction of new bypass, 7) Feasibility study for the construction of a chlorination reservoir and a pumping station for water transfer from lake Marathonas in the region Helidonous, Acharnes, Athens, 8) Water Resources Management study for the Evinos river basin and for the total area of Etoloakarnania Prefecture and Water Resources Management study for Mornos river basin and for the total area of Fokida Prefecture,9) Environmental studies for all the above and hygiene education training programs for the Service.



EOI

The contract provided technical assistant to the client regarding the water supply of greater Athens area, about 300 km long. During the services the following activities were conducted: Water Supply Master Plan and Model, feasibility study and detailed design of several subsystems of the network, Water Resources Management study of Etoloakarnania and Fokida Prefectures, Environmental studies and hygiene education training programs for the Service, increase the institutional capacity of the Client.



DEVELOPMENT OF SYSTEM AND TOOLS FOR WATER RESOURCES MANAGEMENT OF THE WATER DISTRICTS OF ATTIKI, STEREA ELLADA, EPIROUS AND THESSALIA DISTRICTS

Country: GREECE ,   Year: 2003 - 2008 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Water Resources Management

view more

RFP

The project aims at integrated water resources management of the area of interest and the development of the appropriate management tools. It is elaborated in order to assist the Ministry of Development in the implementation of the Water Framework Directive (2000/60). The project includes the following: a. Collection of all the relevant environmental, hydrological and hydro geological information, b. Development of an integrated database and the presentation of all the relevant data in maps (GIS),c. Recording of all activities related to water use d. Use of simulation software (MIKE BASIN & MIKE SHE), e. Water demand assessments and management,f. Analysis of developing projects in the greater area and determination of current and future needs g. Development of a management model and its application to the specific River Basin District, h. Gathering of economic information related to developing activities in the area,i. Development and evaluation of an Economic Model, j. Development and evaluation of transboundary river basin development projects for Aoos and Drinos rivers along the borders with Albania, k. Dissemination actions: workshops, training courses, internet site, documentation, manuals and capacity building, awareness creation, education courses and training on water saving methods.



EOI

The project aims at integrated water resources management of the area of interest and the development of the appropriate management tools. It is elaborated in order to assist the Ministry of Development in the implementation of the Water Framework Directive (2000/60). The project includes the following: data collection, GIS development, recording of all water use activities, water demand assessments, developing of a model, economic assessment, river basin development projects etc



HYDROPLAN E.U.

Country: GREECE ,   Year: 2003 - 2006 ,   Client: - ,   Funding: - ,   Contract Value: - ,   Tags: Sewage and Wastewater

view more

RFP

The global objective of the project is to demonstrate and disseminate a European knowledge management framework, for a procedure (HYDROPLAN) on sustainable asset management with integrated links to best available technologies.
The target is to provide a comprehensive framework tool to share knowledge and collaborate in the development of best management practices and technologies. These practices will then be taken into consideration for pragmatic, cost effective and objective master planning decisions in the European sewerage sector.In Greece the life cases were in Athens (EYDAP) and Thessalonica (EYATH) where the HYDROPLAN methodology was implemented. The objective is to develop an advanced management tool, which will be used in order to take cost effective and pragmatic decisions for the network of the pilot area. With the use of the management tool the Sewer Authorities are planning to improve the functionality of the network and program future investments with the best cost effective way.



EOI

The global objective of the project is to demonstrate and disseminate a European knowledge management framework, for a procedure (HYDROPLAN) with integrated links to best available technologies. In Greece the pilot cases were in Athens (EYDAP) and Thessalonica (EYATH). The objective of this assignment is to develop an advanced management tool to be used to cost effective and pragmatic decisions for the network and help the Authorities to program the future investments.