{"id":2437,"date":"2025-06-02T16:46:13","date_gmt":"2025-06-02T16:46:13","guid":{"rendered":"http:\/\/za.kmdot.com\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/"},"modified":"2024-12-08T22:39:56","modified_gmt":"2024-12-08T20:39:56","slug":"feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province","status":"publish","type":"projects","link":"https:\/\/www.z-a.gr\/el\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/","title":{"rendered":"Feasibility study and detailed design for 11,000 ha &#8211; karangazi valley multipurpose hillside irrigation project in nyagatare district &#8211; eastern province"},"content":{"rendered":"<p>The main objective of the Karangazi Valley Multipurpose Irrigation Project is to increase agricultural and livestock production through provision of infrastructure for irrigation, livestock and domestic water supply by pumping water from Akagera River, which is the only source of sufficient water in the area. A gross area of 11,000 ha gross potential irrigable land and at least 65,000 cattle will be targeted for the supply of water.<br \/>\nThe specific Contract objectives can be listed as follows:<br \/>\n\u2022 To make the Karangazi Valley Multipurpose Project ready for implementation \u2022 To provide RAB, within the scheduled time, with the Feasibility Study, Detailed Designs and Tender Documentation<br \/>\n\u2022 To provide the services in full compliance with the requirements of the Terms of Reference (ToR) and the overall requirements of the Project Contract.<br \/>\n\u2022 To ensure that the developed project will be: \u27a2 In accordance with the countries development objectives; \u27a2 Technically sound and the best of the alternatives; \u27a2 Attractive to the intended beneficiaries; \u27a2 Operationally and managerially workable; \u27a2 Economically and financially viable; and \u27a2 Sustainable and environmentally sound.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The main objective of the Karangazi Valley Multipurpose Irrigation Project is to increase agricultural and livestock production through provision of infrastructure for irrigation, livestock and domestic water supply by pumping water from Akagera River, which is the only source of sufficient water in the area. A gross area of 11,000 ha gross potential irrigable land [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"template":"","meta":{"_acf_changed":false,"footnotes":""},"project-category":[],"country":[151],"project-tag":[166],"class_list":["post-2437","projects","type-projects","status-publish","hentry","country-rwanda","project-tag-irrigation"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Feasibility study and detailed design for 11,000 ha - karangazi valley multipurpose hillside irrigation project in nyagatare district - eastern province - ZA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Feasibility study and detailed design for 11,000 ha - karangazi valley multipurpose hillside irrigation project in nyagatare district - eastern province - ZA\" \/>\n<meta property=\"og:description\" content=\"The main objective of the Karangazi Valley Multipurpose Irrigation Project is to increase agricultural and livestock production through provision of infrastructure for irrigation, livestock and domestic water supply by pumping water from Akagera River, which is the only source of sufficient water in the area. A gross area of 11,000 ha gross potential irrigable land [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/\" \/>\n<meta property=\"og:site_name\" content=\"ZA\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-08T20:39:56+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 \u03bb\u03b5\u03c0\u03c4\u03cc\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/\",\"url\":\"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/\",\"name\":\"Feasibility study and detailed design for 11,000 ha - karangazi valley multipurpose hillside irrigation project in nyagatare district - eastern province - ZA\",\"isPartOf\":{\"@id\":\"https:\/\/www.z-a.gr\/#website\"},\"datePublished\":\"2025-06-02T16:46:13+00:00\",\"dateModified\":\"2024-12-08T20:39:56+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.z-a.gr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.z-a.gr\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Feasibility study and detailed design for 11,000 ha &#8211; karangazi valley multipurpose hillside irrigation project in nyagatare district &#8211; eastern province\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.z-a.gr\/#website\",\"url\":\"https:\/\/www.z-a.gr\/\",\"name\":\"ZA\",\"description\":\"Consulting Engineers\",\"publisher\":{\"@id\":\"https:\/\/www.z-a.gr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.z-a.gr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.z-a.gr\/#organization\",\"name\":\"ZA\",\"url\":\"https:\/\/www.z-a.gr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg\",\"contentUrl\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg\",\"width\":350,\"height\":146,\"caption\":\"ZA\"},\"image\":{\"@id\":\"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Feasibility study and detailed design for 11,000 ha - karangazi valley multipurpose hillside irrigation project in nyagatare district - eastern province - ZA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/","og_locale":"el_GR","og_type":"article","og_title":"Feasibility study and detailed design for 11,000 ha - karangazi valley multipurpose hillside irrigation project in nyagatare district - eastern province - ZA","og_description":"The main objective of the Karangazi Valley Multipurpose Irrigation Project is to increase agricultural and livestock production through provision of infrastructure for irrigation, livestock and domestic water supply by pumping water from Akagera River, which is the only source of sufficient water in the area. A gross area of 11,000 ha gross potential irrigable land [&hellip;]","og_url":"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/","og_site_name":"ZA","article_modified_time":"2024-12-08T20:39:56+00:00","twitter_card":"summary_large_image","twitter_misc":{"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2":"1 \u03bb\u03b5\u03c0\u03c4\u03cc"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/","url":"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/","name":"Feasibility study and detailed design for 11,000 ha - karangazi valley multipurpose hillside irrigation project in nyagatare district - eastern province - ZA","isPartOf":{"@id":"https:\/\/www.z-a.gr\/#website"},"datePublished":"2025-06-02T16:46:13+00:00","dateModified":"2024-12-08T20:39:56+00:00","breadcrumb":{"@id":"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.z-a.gr\/projects\/feasibility-study-and-detailed-design-for-11000-ha-karangazi-valley-multipurpose-hillside-irrigation-project-in-nyagatare-district-eastern-province\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.z-a.gr\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.z-a.gr\/projects\/"},{"@type":"ListItem","position":3,"name":"Feasibility study and detailed design for 11,000 ha &#8211; karangazi valley multipurpose hillside irrigation project in nyagatare district &#8211; eastern province"}]},{"@type":"WebSite","@id":"https:\/\/www.z-a.gr\/#website","url":"https:\/\/www.z-a.gr\/","name":"ZA","description":"Consulting Engineers","publisher":{"@id":"https:\/\/www.z-a.gr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.z-a.gr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/www.z-a.gr\/#organization","name":"ZA","url":"https:\/\/www.z-a.gr\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/","url":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg","contentUrl":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg","width":350,"height":146,"caption":"ZA"},"image":{"@id":"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/2437","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/users\/4"}],"version-history":[{"count":0,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/2437\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/media?parent=2437"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/project-category?post=2437"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/country?post=2437"},{"taxonomy":"project-tag","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/project-tag?post=2437"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}