{"id":2438,"date":"2025-06-01T16:46:13","date_gmt":"2025-06-01T16:46:13","guid":{"rendered":"http:\/\/za.kmdot.com\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/"},"modified":"2025-12-10T14:58:27","modified_gmt":"2025-12-10T12:58:27","slug":"consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a","status":"publish","type":"projects","link":"https:\/\/www.z-a.gr\/el\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/","title":{"rendered":"CONSULTING SERVICES FOR UPDATING THE EXISTING STORMWATER DRAINAGE STUDIES, THE PREPARATION OF BIDDING DOCUMENTS, THE EVALUATION OF TENDERS AND THE SUPERVISION OF CONSTRUCTION OF THE GREATER LIMASSOL AREA"},"content":{"rendered":"<p>The main objective of the Sewerage Board of Limassol &#8211; Amathus (SBLA) was the construction, of the stormwater drainage system of the Greater Limassol Area (1,261ha area).<br \/>\nThe anti-flood works comprise 20,8 km of drainage system. The pipelines consisted of concrete pipes (D500-D1200) of 17.869 km length and box culverts (200 X 100 up to 320 X 200) of 3km length. Along the Lanitis avenue the box culverts were 2X2500X2000 \u2013 1.910m.<br \/>\nThe storm water drainage works comprised the construction of approximately 423 manholes, the connections to the existing drainage system, the construction of drainage gullies and associated pipes and the reinstatement of existing utilities.<br \/>\nA total network of 20,485m was examined. The total contract budget was 16,197,000.00 \u20ac.<\/p>\n<p>Storm Drain Projects costing approximately \u20ac62 million were implemented during Phase 2b of the Board\u2019s new in-vestment program. They included the following:<br \/>\n\u2022 Construction of anti-flood works in western Limassol to resolve the problem of flooding in the area.<br \/>\n\u2022 Construction of a storm drain network in densely populated areas of Limassol.<br \/>\n\u2022 Construction of three retention reservoirs as part of Limassol\u2019s anti-flood measures.<\/p>\n<p>The scope of the service consisted of:<br \/>\n&#8211; Review, validate and update the existing studies for the proposed stormwater drainage network including the bill of quantities<br \/>\n&#8211; Check the proposed design of stormwater drainage system to identify and resolve any utility conflicts es-pecially the conflicts concerning the house connections of the sewerage system.<br \/>\n&#8211; Prepare and submit the Traffic Management Plan that includes details of where and when works will be undertaken (Critical Path Analysis).<br \/>\n-Prepare Health and Safety Policy (Framework Directive) in accordance with the relevant Laws and Regu-lations of the Republic of Cyprus and SBLA Health and Safety Policy<br \/>\n-Assess the existing data regarding the Road Condition and conduct additional geological surveys, if need-ed.<br \/>\n-Evaluate the Hydraulic Capacity Analysis of the existing Stormwater Drainage System including the pro-posed system, by developing a model for various Return Periods.<br \/>\n&#8211; Prepare the Bidding Documents for the procurement of works<br \/>\n-Provide specifications and supplementary information on the works to be procured.<br \/>\n&#8211; Evaluate the bids submitted by the contractor and submit Tender Evaluation Report.<br \/>\n-Construction Supervision<br \/>\n&#8211; Project Management.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The main objective of the Sewerage Board of Limassol &#8211; Amathus (SBLA) was the construction, of the stormwater drainage system of the Greater Limassol Area (1,261ha area). The anti-flood works comprise 20,8 km of drainage system. The pipelines consisted of concrete pipes (D500-D1200) of 17.869 km length and box culverts (200 X 100 up to [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":3535,"template":"","meta":{"_acf_changed":false,"footnotes":""},"project-category":[144,139],"country":[147],"project-tag":[160,162],"class_list":["post-2438","projects","type-projects","status-publish","has-post-thumbnail","hentry","project-category-construction-supervision-services","project-category-storm-water-networks-and-flood-prevention","country-cyprus","project-tag-construction-supervision-services","project-tag-storm-water-networks-and-flood-prevention"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>CONSULTING SERVICES FOR UPDATING THE EXISTING STORMWATER DRAINAGE STUDIES, THE PREPARATION OF BIDDING DOCUMENTS, THE EVALUATION OF TENDERS AND THE SUPERVISION OF CONSTRUCTION OF THE GREATER LIMASSOL AREA - ZA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CONSULTING SERVICES FOR UPDATING THE EXISTING STORMWATER DRAINAGE STUDIES, THE PREPARATION OF BIDDING DOCUMENTS, THE EVALUATION OF TENDERS AND THE SUPERVISION OF CONSTRUCTION OF THE GREATER LIMASSOL AREA - ZA\" \/>\n<meta property=\"og:description\" content=\"The main objective of the Sewerage Board of Limassol &#8211; Amathus (SBLA) was the construction, of the stormwater drainage system of the Greater Limassol Area (1,261ha area). The anti-flood works comprise 20,8 km of drainage system. The pipelines consisted of concrete pipes (D500-D1200) of 17.869 km length and box culverts (200 X 100 up to [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/\" \/>\n<meta property=\"og:site_name\" content=\"ZA\" \/>\n<meta property=\"article:modified_time\" content=\"2025-12-10T12:58:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/06\/IMG_5343-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"2560\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 \u03bb\u03b5\u03c0\u03c4\u03ac\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/\",\"url\":\"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/\",\"name\":\"CONSULTING SERVICES FOR UPDATING THE EXISTING STORMWATER DRAINAGE STUDIES, THE PREPARATION OF BIDDING DOCUMENTS, THE EVALUATION OF TENDERS AND THE SUPERVISION OF CONSTRUCTION OF THE GREATER LIMASSOL AREA - ZA\",\"isPartOf\":{\"@id\":\"https:\/\/www.z-a.gr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/06\/IMG_5343-scaled.jpg\",\"datePublished\":\"2025-06-01T16:46:13+00:00\",\"dateModified\":\"2025-12-10T12:58:27+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/#primaryimage\",\"url\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/06\/IMG_5343-scaled.jpg\",\"contentUrl\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/06\/IMG_5343-scaled.jpg\",\"width\":1920,\"height\":2560,\"caption\":\"Construction Photo in Sp. Kyprianoy Str\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.z-a.gr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.z-a.gr\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"CONSULTING SERVICES FOR UPDATING THE EXISTING STORMWATER DRAINAGE STUDIES, THE PREPARATION OF BIDDING DOCUMENTS, THE EVALUATION OF TENDERS AND THE SUPERVISION OF CONSTRUCTION OF THE GREATER LIMASSOL AREA\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.z-a.gr\/#website\",\"url\":\"https:\/\/www.z-a.gr\/\",\"name\":\"ZA\",\"description\":\"Consulting Engineers\",\"publisher\":{\"@id\":\"https:\/\/www.z-a.gr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.z-a.gr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.z-a.gr\/#organization\",\"name\":\"ZA\",\"url\":\"https:\/\/www.z-a.gr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg\",\"contentUrl\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg\",\"width\":350,\"height\":146,\"caption\":\"ZA\"},\"image\":{\"@id\":\"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CONSULTING SERVICES FOR UPDATING THE EXISTING STORMWATER DRAINAGE STUDIES, THE PREPARATION OF BIDDING DOCUMENTS, THE EVALUATION OF TENDERS AND THE SUPERVISION OF CONSTRUCTION OF THE GREATER LIMASSOL AREA - ZA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/","og_locale":"el_GR","og_type":"article","og_title":"CONSULTING SERVICES FOR UPDATING THE EXISTING STORMWATER DRAINAGE STUDIES, THE PREPARATION OF BIDDING DOCUMENTS, THE EVALUATION OF TENDERS AND THE SUPERVISION OF CONSTRUCTION OF THE GREATER LIMASSOL AREA - ZA","og_description":"The main objective of the Sewerage Board of Limassol &#8211; Amathus (SBLA) was the construction, of the stormwater drainage system of the Greater Limassol Area (1,261ha area). The anti-flood works comprise 20,8 km of drainage system. The pipelines consisted of concrete pipes (D500-D1200) of 17.869 km length and box culverts (200 X 100 up to [&hellip;]","og_url":"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/","og_site_name":"ZA","article_modified_time":"2025-12-10T12:58:27+00:00","og_image":[{"width":1920,"height":2560,"url":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/06\/IMG_5343-scaled.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2":"2 \u03bb\u03b5\u03c0\u03c4\u03ac"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/","url":"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/","name":"CONSULTING SERVICES FOR UPDATING THE EXISTING STORMWATER DRAINAGE STUDIES, THE PREPARATION OF BIDDING DOCUMENTS, THE EVALUATION OF TENDERS AND THE SUPERVISION OF CONSTRUCTION OF THE GREATER LIMASSOL AREA - ZA","isPartOf":{"@id":"https:\/\/www.z-a.gr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/#primaryimage"},"image":{"@id":"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/#primaryimage"},"thumbnailUrl":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/06\/IMG_5343-scaled.jpg","datePublished":"2025-06-01T16:46:13+00:00","dateModified":"2025-12-10T12:58:27+00:00","breadcrumb":{"@id":"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/#primaryimage","url":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/06\/IMG_5343-scaled.jpg","contentUrl":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/06\/IMG_5343-scaled.jpg","width":1920,"height":2560,"caption":"Construction Photo in Sp. Kyprianoy Str"},{"@type":"BreadcrumbList","@id":"https:\/\/www.z-a.gr\/projects\/consulting-services-for-updating-the-existing-stormwater-drainage-studies-the-preparation-of-bidding-documents-the-evaluation-of-tenders-and-the-supervision-of-construction-of-the-greater-limassol-a\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.z-a.gr\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.z-a.gr\/projects\/"},{"@type":"ListItem","position":3,"name":"CONSULTING SERVICES FOR UPDATING THE EXISTING STORMWATER DRAINAGE STUDIES, THE PREPARATION OF BIDDING DOCUMENTS, THE EVALUATION OF TENDERS AND THE SUPERVISION OF CONSTRUCTION OF THE GREATER LIMASSOL AREA"}]},{"@type":"WebSite","@id":"https:\/\/www.z-a.gr\/#website","url":"https:\/\/www.z-a.gr\/","name":"ZA","description":"Consulting Engineers","publisher":{"@id":"https:\/\/www.z-a.gr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.z-a.gr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/www.z-a.gr\/#organization","name":"ZA","url":"https:\/\/www.z-a.gr\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/","url":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg","contentUrl":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg","width":350,"height":146,"caption":"ZA"},"image":{"@id":"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/2438","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/users\/5"}],"version-history":[{"count":4,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/2438\/revisions"}],"predecessor-version":[{"id":3539,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/2438\/revisions\/3539"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/media\/3535"}],"wp:attachment":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/media?parent=2438"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/project-category?post=2438"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/country?post=2438"},{"taxonomy":"project-tag","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/project-tag?post=2438"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}