{"id":2541,"date":"2025-02-18T16:46:13","date_gmt":"2025-02-18T16:46:13","guid":{"rendered":"http:\/\/za.kmdot.com\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/"},"modified":"2024-12-08T22:41:37","modified_gmt":"2024-12-08T20:41:37","slug":"water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant","status":"publish","type":"projects","link":"https:\/\/www.z-a.gr\/el\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/","title":{"rendered":"Water supply of salonica from aliakmonas river, phase a: design, construction and operation of water treatment plant"},"content":{"rendered":"<p>The Water Treatment Plant of Salonika receives water from Aliakmon River and treats it to potable for the supply of the urban group of Salonica town. The plant is located at Sindos area, 11 km west of Salonica. The Plant has a treatment capacity of 150.000 m\u00b3\/day at present stage, with provision up to 600.000 m\u00b3\/day at complete development. The treatment achieves removal of solids, asbestos, pesticides and organic load. At present stage, the Plant supplies water to 1,100,000 inhabitants of the city.The dams constructed along Aliakmon River for irrigation and energy production, ensure a high degree of flow regulation. The water is diverted to an open channel, connecting Aliakmon with Axios River, from where it is siphoned under the river to Sindos Pumping Station with an 8 km pipe. It is then pumped to the plant (Tank D2) by a 5 km discharge pipe, where it enters through a DN 1700 steel pipe, equipped with a regulating valve and a flow-meter for flow regulation.<br \/>\nThe Water Treatment Plant of Salonika, located at Sindos area, 11 km west of Salonica, receives water from Aliakmon River and treats it to potable for the supply of the urban group of Salonica town. The treatment capacity is 150.000 m\u00b3\/day, with provision up to 600.000 m\u00b3\/day at complete development to supply water to 1,100,000 inhabitants of the city. The water is diverted to the WWTP form Aliakmon and Axios River.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Water Treatment Plant of Salonika receives water from Aliakmon River and treats it to potable for the supply of the urban group of Salonica town. The plant is located at Sindos area, 11 km west of Salonica. The Plant has a treatment capacity of 150.000 m\u00b3\/day at present stage, with provision up to 600.000 [&hellip;]<\/p>\n","protected":false},"author":4,"featured_media":0,"template":"","meta":{"_acf_changed":false,"footnotes":""},"project-category":[],"country":[146],"project-tag":[],"class_list":["post-2541","projects","type-projects","status-publish","hentry","country-greece"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Water supply of salonica from aliakmonas river, phase a: design, construction and operation of water treatment plant - ZA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Water supply of salonica from aliakmonas river, phase a: design, construction and operation of water treatment plant - ZA\" \/>\n<meta property=\"og:description\" content=\"The Water Treatment Plant of Salonika receives water from Aliakmon River and treats it to potable for the supply of the urban group of Salonica town. The plant is located at Sindos area, 11 km west of Salonica. The Plant has a treatment capacity of 150.000 m\u00b3\/day at present stage, with provision up to 600.000 [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/\" \/>\n<meta property=\"og:site_name\" content=\"ZA\" \/>\n<meta property=\"article:modified_time\" content=\"2024-12-08T20:41:37+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 \u03bb\u03b5\u03c0\u03c4\u03cc\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/\",\"url\":\"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/\",\"name\":\"Water supply of salonica from aliakmonas river, phase a: design, construction and operation of water treatment plant - ZA\",\"isPartOf\":{\"@id\":\"https:\/\/www.z-a.gr\/#website\"},\"datePublished\":\"2025-02-18T16:46:13+00:00\",\"dateModified\":\"2024-12-08T20:41:37+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.z-a.gr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.z-a.gr\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Water supply of salonica from aliakmonas river, phase a: design, construction and operation of water treatment plant\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.z-a.gr\/#website\",\"url\":\"https:\/\/www.z-a.gr\/\",\"name\":\"ZA\",\"description\":\"Consulting Engineers\",\"publisher\":{\"@id\":\"https:\/\/www.z-a.gr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.z-a.gr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.z-a.gr\/#organization\",\"name\":\"ZA\",\"url\":\"https:\/\/www.z-a.gr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg\",\"contentUrl\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg\",\"width\":350,\"height\":146,\"caption\":\"ZA\"},\"image\":{\"@id\":\"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Water supply of salonica from aliakmonas river, phase a: design, construction and operation of water treatment plant - ZA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/","og_locale":"el_GR","og_type":"article","og_title":"Water supply of salonica from aliakmonas river, phase a: design, construction and operation of water treatment plant - ZA","og_description":"The Water Treatment Plant of Salonika receives water from Aliakmon River and treats it to potable for the supply of the urban group of Salonica town. The plant is located at Sindos area, 11 km west of Salonica. The Plant has a treatment capacity of 150.000 m\u00b3\/day at present stage, with provision up to 600.000 [&hellip;]","og_url":"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/","og_site_name":"ZA","article_modified_time":"2024-12-08T20:41:37+00:00","twitter_card":"summary_large_image","twitter_misc":{"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2":"1 \u03bb\u03b5\u03c0\u03c4\u03cc"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/","url":"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/","name":"Water supply of salonica from aliakmonas river, phase a: design, construction and operation of water treatment plant - ZA","isPartOf":{"@id":"https:\/\/www.z-a.gr\/#website"},"datePublished":"2025-02-18T16:46:13+00:00","dateModified":"2024-12-08T20:41:37+00:00","breadcrumb":{"@id":"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.z-a.gr\/projects\/water-supply-of-salonica-from-aliakmonas-river-phase-a-design-construction-and-operation-of-water-treatment-plant\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.z-a.gr\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.z-a.gr\/projects\/"},{"@type":"ListItem","position":3,"name":"Water supply of salonica from aliakmonas river, phase a: design, construction and operation of water treatment plant"}]},{"@type":"WebSite","@id":"https:\/\/www.z-a.gr\/#website","url":"https:\/\/www.z-a.gr\/","name":"ZA","description":"Consulting Engineers","publisher":{"@id":"https:\/\/www.z-a.gr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.z-a.gr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/www.z-a.gr\/#organization","name":"ZA","url":"https:\/\/www.z-a.gr\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/","url":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg","contentUrl":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg","width":350,"height":146,"caption":"ZA"},"image":{"@id":"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/2541","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/users\/4"}],"version-history":[{"count":0,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/2541\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/media?parent=2541"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/project-category?post=2541"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/country?post=2541"},{"taxonomy":"project-tag","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/project-tag?post=2541"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}