{"id":3415,"date":"2025-11-20T16:27:02","date_gmt":"2025-11-20T14:27:02","guid":{"rendered":"https:\/\/www.z-a.gr\/?post_type=projects&#038;p=3415"},"modified":"2025-11-25T15:49:34","modified_gmt":"2025-11-25T13:49:34","slug":"consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams","status":"publish","type":"projects","link":"https:\/\/www.z-a.gr\/el\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/","title":{"rendered":"CONSULTANCY SERVICE FOR DETAILED DESIGN AND REVIEW OF ESMPS\/BMPS FOR CHIBALASHI AND KATEMBULA DAMS"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">\u03a4he objective of the proposed assignment was to provide detailed designs for construction remediation of the two dams after review of designs dams from UNOPS.\u00a0 Further the consultant reviewed and modified the ESMP and the BMP submitted by UNOPS to suit the new designs for the two dams.<\/p>\n\n\n\n<figure class=\"wp-block-table\"><table class=\"has-fixed-layout\"><tbody><tr><td><strong>Name of dam site<\/strong><\/td><td><strong>Height<\/strong><\/td><td><strong>&nbsp;Current storage capacity (m<sup>3<\/sup>)<\/strong><\/td><td><strong>Summary of Remedial measures identified<\/strong><\/td><\/tr><tr><td>Katembula (Construction Date 2016)<\/td><td>9 m<\/td><td>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 2,030,000<\/td><td>Raising of dam embankment, Spillways\/approach\/return channels works (current spillway level maintained), Drainage Works.<\/td><\/tr><tr><td>Chibalashi(Construction Date 2016)<\/td><td>9 m<\/td><td>&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp;&nbsp; 3,150,000<\/td><td>Raising of dam embankment, Spillways\/approach\/return channels works (current spillway level maintained), Drainage Works.<\/td><\/tr><\/tbody><\/table><\/figure>\n\n\n\n<p class=\"wp-block-paragraph\">The services were organized in three parts:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 Review the designs and ensure compliance with the technical specification and design solution of the works implemented by the contractor<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">\u2022 Supervision of construction works and implementation of safeguard measures. \u2022 Training Activities for stakeholders such as dam committees and district local staff.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>\u03a4he objective of the proposed assignment was to provide detailed designs for construction remediation of the two dams after review of designs dams from UNOPS.\u00a0 Further the consultant reviewed and modified the ESMP and the BMP submitted by UNOPS to suit the new designs for the two dams. Name of dam site Height &nbsp;Current storage [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":3416,"template":"","meta":{"_acf_changed":false,"footnotes":""},"project-category":[140,145],"country":[154],"project-tag":[167],"class_list":["post-3415","projects","type-projects","status-publish","has-post-thumbnail","hentry","project-category-dams-hydropower","project-category-design-review","country-zambia","project-tag-dams-hydropower"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>CONSULTANCY SERVICE FOR DETAILED DESIGN AND REVIEW OF ESMPS\/BMPS FOR CHIBALASHI AND KATEMBULA DAMS - ZA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CONSULTANCY SERVICE FOR DETAILED DESIGN AND REVIEW OF ESMPS\/BMPS FOR CHIBALASHI AND KATEMBULA DAMS - ZA\" \/>\n<meta property=\"og:description\" content=\"\u03a4he objective of the proposed assignment was to provide detailed designs for construction remediation of the two dams after review of designs dams from UNOPS.\u00a0 Further the consultant reviewed and modified the ESMP and the BMP submitted by UNOPS to suit the new designs for the two dams. Name of dam site Height &nbsp;Current storage [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/\" \/>\n<meta property=\"og:site_name\" content=\"ZA\" \/>\n<meta property=\"article:modified_time\" content=\"2025-11-25T13:49:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/11\/WhatsApp-Image-2024-08-30-at-7.57.33-PM-1.jpeg\" \/>\n\t<meta property=\"og:image:width\" content=\"810\" \/>\n\t<meta property=\"og:image:height\" content=\"1080\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2\" \/>\n\t<meta name=\"twitter:data1\" content=\"1 \u03bb\u03b5\u03c0\u03c4\u03cc\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/\",\"url\":\"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/\",\"name\":\"CONSULTANCY SERVICE FOR DETAILED DESIGN AND REVIEW OF ESMPS\/BMPS FOR CHIBALASHI AND KATEMBULA DAMS - ZA\",\"isPartOf\":{\"@id\":\"https:\/\/www.z-a.gr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/11\/WhatsApp-Image-2024-08-30-at-7.57.33-PM-1.jpeg\",\"datePublished\":\"2025-11-20T14:27:02+00:00\",\"dateModified\":\"2025-11-25T13:49:34+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/#primaryimage\",\"url\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/11\/WhatsApp-Image-2024-08-30-at-7.57.33-PM-1.jpeg\",\"contentUrl\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/11\/WhatsApp-Image-2024-08-30-at-7.57.33-PM-1.jpeg\",\"width\":810,\"height\":1080,\"caption\":\"Chibalasi\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.z-a.gr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.z-a.gr\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"CONSULTANCY SERVICE FOR DETAILED DESIGN AND REVIEW OF ESMPS\/BMPS FOR CHIBALASHI AND KATEMBULA DAMS\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.z-a.gr\/#website\",\"url\":\"https:\/\/www.z-a.gr\/\",\"name\":\"ZA\",\"description\":\"Consulting Engineers\",\"publisher\":{\"@id\":\"https:\/\/www.z-a.gr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.z-a.gr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.z-a.gr\/#organization\",\"name\":\"ZA\",\"url\":\"https:\/\/www.z-a.gr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg\",\"contentUrl\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg\",\"width\":350,\"height\":146,\"caption\":\"ZA\"},\"image\":{\"@id\":\"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CONSULTANCY SERVICE FOR DETAILED DESIGN AND REVIEW OF ESMPS\/BMPS FOR CHIBALASHI AND KATEMBULA DAMS - ZA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/","og_locale":"el_GR","og_type":"article","og_title":"CONSULTANCY SERVICE FOR DETAILED DESIGN AND REVIEW OF ESMPS\/BMPS FOR CHIBALASHI AND KATEMBULA DAMS - ZA","og_description":"\u03a4he objective of the proposed assignment was to provide detailed designs for construction remediation of the two dams after review of designs dams from UNOPS.\u00a0 Further the consultant reviewed and modified the ESMP and the BMP submitted by UNOPS to suit the new designs for the two dams. Name of dam site Height &nbsp;Current storage [&hellip;]","og_url":"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/","og_site_name":"ZA","article_modified_time":"2025-11-25T13:49:34+00:00","og_image":[{"width":810,"height":1080,"url":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/11\/WhatsApp-Image-2024-08-30-at-7.57.33-PM-1.jpeg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2":"1 \u03bb\u03b5\u03c0\u03c4\u03cc"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/","url":"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/","name":"CONSULTANCY SERVICE FOR DETAILED DESIGN AND REVIEW OF ESMPS\/BMPS FOR CHIBALASHI AND KATEMBULA DAMS - ZA","isPartOf":{"@id":"https:\/\/www.z-a.gr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/#primaryimage"},"image":{"@id":"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/#primaryimage"},"thumbnailUrl":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/11\/WhatsApp-Image-2024-08-30-at-7.57.33-PM-1.jpeg","datePublished":"2025-11-20T14:27:02+00:00","dateModified":"2025-11-25T13:49:34+00:00","breadcrumb":{"@id":"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/#primaryimage","url":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/11\/WhatsApp-Image-2024-08-30-at-7.57.33-PM-1.jpeg","contentUrl":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2025\/11\/WhatsApp-Image-2024-08-30-at-7.57.33-PM-1.jpeg","width":810,"height":1080,"caption":"Chibalasi"},{"@type":"BreadcrumbList","@id":"https:\/\/www.z-a.gr\/projects\/consultancy-service-for-detailed-design-and-review-of-esmps-bmps-for-chibalashi-and-katembula-dams\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.z-a.gr\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.z-a.gr\/projects\/"},{"@type":"ListItem","position":3,"name":"CONSULTANCY SERVICE FOR DETAILED DESIGN AND REVIEW OF ESMPS\/BMPS FOR CHIBALASHI AND KATEMBULA DAMS"}]},{"@type":"WebSite","@id":"https:\/\/www.z-a.gr\/#website","url":"https:\/\/www.z-a.gr\/","name":"ZA","description":"Consulting Engineers","publisher":{"@id":"https:\/\/www.z-a.gr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.z-a.gr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/www.z-a.gr\/#organization","name":"ZA","url":"https:\/\/www.z-a.gr\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/","url":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg","contentUrl":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg","width":350,"height":146,"caption":"ZA"},"image":{"@id":"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/3415","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/users\/5"}],"version-history":[{"count":1,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/3415\/revisions"}],"predecessor-version":[{"id":3418,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/3415\/revisions\/3418"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/media\/3416"}],"wp:attachment":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/media?parent=3415"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/project-category?post=3415"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/country?post=3415"},{"taxonomy":"project-tag","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/project-tag?post=3415"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}