{"id":3613,"date":"2026-06-11T11:03:10","date_gmt":"2026-06-11T09:03:10","guid":{"rendered":"https:\/\/www.z-a.gr\/?post_type=projects&#038;p=3613"},"modified":"2026-06-11T13:04:31","modified_gmt":"2026-06-11T11:04:31","slug":"consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam","status":"publish","type":"projects","link":"https:\/\/www.z-a.gr\/el\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/","title":{"rendered":"CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED DESIGN AND TENDER DOCUMENTS FOR THE REHABILITATION\/UPGRADING OF THE NAMPULA DAM"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">The Nampula dam situated on the Monapo River approximately 15 km north from the center of the city. The Main Characteristics of the Nampula Dam are:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Type of dam: Concrete gravity, Construction period: 1957-1959, Gross storage capacity: 3.8 hm3, Spillway type: Free, with Creager sill, Bottom outlet:\u03a6 60 cm (disabled), located at elevation 317 m, Dam height: 25.5 m, Spillway length: 133 m<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The Nampula dam is the main water source for the city of Nampula. It was partly rehabilitated in 1978-79 and again in 2004, mostly focusing on drainage and percolation. Later inspections have shown that these interventions were not very effective, and thus leakage into the drainage gallery was excessive, while the groundwater pressures act-ing at the base of the dam are unknown. Today there is no monitoring, no emergency plan, and the dam needs re-habilitation<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As per Terms of Reference (ToR), the Project\u2019s Scope of Work is to:<br>1.Review and update the previous studies of the safety assessment of the Nampula dam;<br>2.Prepare a Feasibility Study (FS) for the Project\u2019s rehabilitation\/upgrading, considering different options. This scope includes: (a) an Investigation Plan and Technical Specifications, (b) the analysis and interpretation of the results of the investigations, (c) Design Criteria Report, (d) Hydrology and Hydraulics Report, (e) Report on Stability and structural analyses, (f) Report on Potential Failure Mode Analysis (PFMA), (g) Report on Reservoir Sedimentation Analysis, (h) Basic Design of alternatives for the Project\u2019s rehabilitation\/upgrading, (i) Multicriteria Analysis Report, and (j) Feasibility Study of the preferred option.<br>3.Prepare Detailed Design (DD) and Tender Documents for the preferred option for the rehabilitation\/upgrading of the Nampula dam;<br>4.Develop a comprehensive Dam Safety Management Plan (DSMP) for the dam in compliance with Mozambican laws and dam safety regulations, the World Bank Environmental and Social Framework (ESF) World Bank Good Practice note on dam safety, Good International Industry Practice (GIIP), and relevant WBG Environmental, Health and Safety Guidelines (EHSGs).<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The service covers the field of:<br>Feasibility Study<br>Detail Design Study<br>Tender Documents<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Nampula dam situated on the Monapo River approximately 15 km north from the center of the city. The Main Characteristics of the Nampula Dam are: Type of dam: Concrete gravity, Construction period: 1957-1959, Gross storage capacity: 3.8 hm3, Spillway type: Free, with Creager sill, Bottom outlet:\u03a6 60 cm (disabled), located at elevation 317 m, [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":3614,"template":"","meta":{"_acf_changed":false,"footnotes":""},"project-category":[140],"country":[171],"project-tag":[167,169],"class_list":["post-3613","projects","type-projects","status-publish","has-post-thumbnail","hentry","project-category-dams-hydropower","country-mozambique","project-tag-dams-hydropower","project-tag-design-review"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v24.0 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED DESIGN AND TENDER DOCUMENTS FOR THE REHABILITATION\/UPGRADING OF THE NAMPULA DAM - ZA<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/\" \/>\n<meta property=\"og:locale\" content=\"el_GR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED DESIGN AND TENDER DOCUMENTS FOR THE REHABILITATION\/UPGRADING OF THE NAMPULA DAM - ZA\" \/>\n<meta property=\"og:description\" content=\"The Nampula dam situated on the Monapo River approximately 15 km north from the center of the city. The Main Characteristics of the Nampula Dam are: Type of dam: Concrete gravity, Construction period: 1957-1959, Gross storage capacity: 3.8 hm3, Spillway type: Free, with Creager sill, Bottom outlet:\u03a6 60 cm (disabled), located at elevation 317 m, [&hellip;]\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/\" \/>\n<meta property=\"og:site_name\" content=\"ZA\" \/>\n<meta property=\"article:modified_time\" content=\"2026-06-11T11:04:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2026\/06\/dam-Spillway-rotated.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1080\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 \u03bb\u03b5\u03c0\u03c4\u03ac\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/\",\"url\":\"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/\",\"name\":\"CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED DESIGN AND TENDER DOCUMENTS FOR THE REHABILITATION\/UPGRADING OF THE NAMPULA DAM - ZA\",\"isPartOf\":{\"@id\":\"https:\/\/www.z-a.gr\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/#primaryimage\"},\"thumbnailUrl\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2026\/06\/dam-Spillway-rotated.jpg\",\"datePublished\":\"2026-06-11T09:03:10+00:00\",\"dateModified\":\"2026-06-11T11:04:31+00:00\",\"breadcrumb\":{\"@id\":\"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/#breadcrumb\"},\"inLanguage\":\"el\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/#primaryimage\",\"url\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2026\/06\/dam-Spillway-rotated.jpg\",\"contentUrl\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2026\/06\/dam-Spillway-rotated.jpg\",\"width\":1080,\"height\":1920,\"caption\":\"OLYMPUS DIGITAL CAMERA\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/www.z-a.gr\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Projects\",\"item\":\"https:\/\/www.z-a.gr\/projects\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED DESIGN AND TENDER DOCUMENTS FOR THE REHABILITATION\/UPGRADING OF THE NAMPULA DAM\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/www.z-a.gr\/#website\",\"url\":\"https:\/\/www.z-a.gr\/\",\"name\":\"ZA\",\"description\":\"Consulting Engineers\",\"publisher\":{\"@id\":\"https:\/\/www.z-a.gr\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/www.z-a.gr\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"el\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/www.z-a.gr\/#organization\",\"name\":\"ZA\",\"url\":\"https:\/\/www.z-a.gr\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"el\",\"@id\":\"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg\",\"contentUrl\":\"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg\",\"width\":350,\"height\":146,\"caption\":\"ZA\"},\"image\":{\"@id\":\"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED DESIGN AND TENDER DOCUMENTS FOR THE REHABILITATION\/UPGRADING OF THE NAMPULA DAM - ZA","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/","og_locale":"el_GR","og_type":"article","og_title":"CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED DESIGN AND TENDER DOCUMENTS FOR THE REHABILITATION\/UPGRADING OF THE NAMPULA DAM - ZA","og_description":"The Nampula dam situated on the Monapo River approximately 15 km north from the center of the city. The Main Characteristics of the Nampula Dam are: Type of dam: Concrete gravity, Construction period: 1957-1959, Gross storage capacity: 3.8 hm3, Spillway type: Free, with Creager sill, Bottom outlet:\u03a6 60 cm (disabled), located at elevation 317 m, [&hellip;]","og_url":"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/","og_site_name":"ZA","article_modified_time":"2026-06-11T11:04:31+00:00","og_image":[{"width":1080,"height":1920,"url":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2026\/06\/dam-Spillway-rotated.jpg","type":"image\/jpeg"}],"twitter_card":"summary_large_image","twitter_misc":{"\u0395\u03ba\u03c4\u03b9\u03bc\u03ce\u03bc\u03b5\u03bd\u03bf\u03c2 \u03c7\u03c1\u03cc\u03bd\u03bf\u03c2 \u03b1\u03bd\u03ac\u03b3\u03bd\u03c9\u03c3\u03b7\u03c2":"2 \u03bb\u03b5\u03c0\u03c4\u03ac"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/","url":"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/","name":"CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED DESIGN AND TENDER DOCUMENTS FOR THE REHABILITATION\/UPGRADING OF THE NAMPULA DAM - ZA","isPartOf":{"@id":"https:\/\/www.z-a.gr\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/#primaryimage"},"image":{"@id":"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/#primaryimage"},"thumbnailUrl":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2026\/06\/dam-Spillway-rotated.jpg","datePublished":"2026-06-11T09:03:10+00:00","dateModified":"2026-06-11T11:04:31+00:00","breadcrumb":{"@id":"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/#breadcrumb"},"inLanguage":"el","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/"]}]},{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/#primaryimage","url":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2026\/06\/dam-Spillway-rotated.jpg","contentUrl":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2026\/06\/dam-Spillway-rotated.jpg","width":1080,"height":1920,"caption":"OLYMPUS DIGITAL CAMERA"},{"@type":"BreadcrumbList","@id":"https:\/\/www.z-a.gr\/projects\/consultancy-services-for-feasibility-study-detailed-design-and-tender-documents-for-the-rehabilitation-upgrading-of-the-nampula-dam\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.z-a.gr\/"},{"@type":"ListItem","position":2,"name":"Projects","item":"https:\/\/www.z-a.gr\/projects\/"},{"@type":"ListItem","position":3,"name":"CONSULTANCY SERVICES FOR FEASIBILITY STUDY, DETAILED DESIGN AND TENDER DOCUMENTS FOR THE REHABILITATION\/UPGRADING OF THE NAMPULA DAM"}]},{"@type":"WebSite","@id":"https:\/\/www.z-a.gr\/#website","url":"https:\/\/www.z-a.gr\/","name":"ZA","description":"Consulting Engineers","publisher":{"@id":"https:\/\/www.z-a.gr\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.z-a.gr\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"el"},{"@type":"Organization","@id":"https:\/\/www.z-a.gr\/#organization","name":"ZA","url":"https:\/\/www.z-a.gr\/","logo":{"@type":"ImageObject","inLanguage":"el","@id":"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/","url":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg","contentUrl":"https:\/\/www.z-a.gr\/wp-content\/uploads\/2024\/11\/Z-A-quality1-1.jpg","width":350,"height":146,"caption":"ZA"},"image":{"@id":"https:\/\/www.z-a.gr\/#\/schema\/logo\/image\/"}}]}},"_links":{"self":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/3613","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects"}],"about":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/types\/projects"}],"author":[{"embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/users\/5"}],"version-history":[{"count":3,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/3613\/revisions"}],"predecessor-version":[{"id":3619,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/projects\/3613\/revisions\/3619"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/media\/3614"}],"wp:attachment":[{"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/media?parent=3613"}],"wp:term":[{"taxonomy":"project-category","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/project-category?post=3613"},{"taxonomy":"country","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/country?post=3613"},{"taxonomy":"project-tag","embeddable":true,"href":"https:\/\/www.z-a.gr\/el\/wp-json\/wp\/v2\/project-tag?post=3613"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}