CONSULTANCY SERVICES FOR UPDATING OF FEASIBILITY STUDIES AND PREPARATION OF DETAILED DESIGNS FOR WATER SUPPLY IM-PROVEMENT IN MZUZU
Country:
Malawi
Client:
Northern Region Water Board
Year:
2026 - On Going
Funding:
AfDB
Contract Value:
1,754,579.01 € (~1,915,851,13 USD)
The objective of the present assignment, according to the Terms of Reference, is to review and update the Fea-sibility Study and Preliminary Designs developed by Sogreah Consulting Engineers from 2008 to 2010 and to prepare Detailed Designs and Tender Documents for Lambilambi dam and associated water supply works for Mzuzu City and parts of Mzimba Districts as well as to prepare the Dam Safety plans.
The updating of the Feasibility Study and Preliminary Designs will at first focus on the option selected by Sogreah, which centres on the Lambilambi dam as the next major water supply source for Mzuzu City up to the year 2045, to be followed by the addition of the Lichelemu dam to meet demand up to the year 2063. Alterna-tives to the Lichelemu dam as a second phase water source will also be assessed
The Lunyangwa Dam storage capacity is about 4.36 million m³, and can provide an average of 19,000 m3/day. On the other hand, according to the ToR, the current demand in the existing water supply area is estimated at 41,147 m3/day and the projected demand for the year 2045 is 114,000 m3/day. The existing water supply system is thus unable to provide a reliable water supply and meet demand with some people receiving water only during some hours of the day and no available supply of potable water to newly developed areas.
The Mzuzu Water Treatment Plant (WTP) is located at a distance of 1.4km downstream of the Lunyangwa Dam. The plant capacity was upgraded from the designed capacity of 16,400m3/day to 21,200m3/day in 2010. Its raw water supply comes from the Lunyangwa Dam and from the river-weir intake at the plant location. The core treat-ment process involves coagulation–flocculation, sedimentation, filtration and chlorination
From previous reports, the average water demand has been projected as 114,000m3/day in 2045; 193,083m3/day in 2055 and 358,626m3/day in 2063.
The Preliminary Design Report (Sogreah, 2010a) deals with the Preliminary Design of Lambilambi dam and the downstream facilities to convey and treat the water supply to Mzuzu.
According to the Preliminary Design, the Lambilambi dam will be a rockfill dam, which is the most suitable type of dam considering the site conditions. The main characteristics will be as follows: Height above riverbed: 41 m, Crest length: 212m, Volume of embankment: 305,000m3. Spillway: Type: free flow spillway, on the left bank, Ca-pacity: 605m3/s, Crest length: 40m.
The raw water transmission pipeline, from the dam to the water treatment plant, will have a length of nearly 29 km and a (outside) diameter of 660 mm is required to enable gravity flow
The water treatment plant is designed to meet the maximum day demand, which is 20% higher than the average day demand. Its long-term capacity should be 90,000 m3/day of raw water
The following deliverables were finally agreed based on the ToR.
i. Review the water demand and confirm the water supply requirements/schedule (including urban water supply, irrigation, fisheries, in-stream flow requirements, and hydropower generation).
ii. Determine population served, per capita demand, and non-revenue water assumptions.
iii. Confirm the dam site and type selection summarizing the pros and cons of options previously studied.
iv. Coordinate with the Environmental and Social review consultancy.
v. Undertake a risk analysis as per the World Bank Environmental and Social Framework, Environmental and Social Standard 4 (ESF/ESS4) with reference to the Good Practice Note (GPN) on Dam Safety including a preliminary downstream consequence assessment and downstream topographic survey and land use using satellite images, etc.
vi. Prepare four dam safety plans as per the ESF/ESS4 and GPN.
vii. Prepare the cost estimates
viii. Prepare the bidding documents and Construction Supervision & Quality Assurance Plan.
ix. Prepare the overall project implementation arrangement and risk management