CONSULTANCY SERVICES FOR DESIGN REVIEW AND CONSTRUCTION SUPERVISION OF SALIMA – LILONGWE WATER SUPPLY PROJECT

The project scope consists of engineering, procurement, construction, commissioning of a standalone system that will supply potable water to the City of Lilongwe and its surrounds. The major project components, are listed as follows:

  1. Intake works, 532 m from shore into Lake Malawi with an abstraction capacity of 4772.7 m3/hour (105,000 m3/d).
  2. Onshore raw water pumping station, pumping through two DN 800 mm DI pipe, 710m, with a capacity of 4772.7 m3/hour.
  3. Water Treatment Works through pressure filters with an overall plant capacity of 4166.7 m3/hr..
  4. Lifuwu clear water tank with a capacity of 8000m3 (2x 4000m3).
  5. Transmission pipeline (Lifuwu to Katengeza): treated water will be conveyed through a DN 1200mm Mild Steel Pipe (46.15 km) with a minor section (3.25 km) of class 40 pipe from Lifuwu clear water tank (Sump) to Katengeza clear water tank a total length of 49.40 km. This pipeline will supply a flow of 4545.45 m3/hr.
  6. Katengeza clear water tank with a capacity of 10 000m3 (2x 5000m3)
  7. Pumping main (Katengeza to Mvera), treated water will be conveyed through a DN 1200mm Mild Steel Pipe from Katengeza clear water tank (Sump) to Mvera clear water tank a total length of 12.72 km.
  8. Clear water tank (8 000m3) and Pumping Station
  9. Clear water pumping main from Mvera to Dowa turnoff:
  10. Dowa turn off, 8 000 m3; there will be 2x 4000m3 clear water tanks.
  11. Gravity main, water will be conveyed by gravity from Dowa turn off reservoirs to existing Kanengo reser-voirs Mild Steel Pipe , a total length of 36.90 km.
  12. ESCOM power supply and standby power supply in the form of diesel generators for all the pump stations, water treatment and the abstraction works.
  13. SCADA system for the control and monitoring of the water supply system

The service covers the field of:
Design Review
Supervision of Construction