CONSULTANCY SERVICE FOR DETAILED DESIGN AND REVIEW OF ESMPS/BMPS FOR CHIBALASHI AND KATEMBULA DAMS
Τhe objective of the proposed assignment was to provide detailed designs for construction remediation of the two dams after review of designs dams from UNOPS. Further the consultant reviewed and modified the ESMP and the BMP submitted by UNOPS to suit the new designs for the two dams.
| Name of dam site | Height | Current storage capacity (m3) | Summary of Remedial measures identified |
| Katembula (Construction Date 2016) | 9 m | 2,030,000 | Raising of dam embankment, Spillways/approach/return channels works (current spillway level maintained), Drainage Works. |
| Chibalashi(Construction Date 2016) | 9 m | 3,150,000 | Raising of dam embankment, Spillways/approach/return channels works (current spillway level maintained), Drainage Works. |
The services were organized in three parts:
• Review the designs and ensure compliance with the technical specification and design solution of the works implemented by the contractor
• Supervision of construction works and implementation of safeguard measures. • Training Activities for stakeholders such as dam committees and district local staff.