REHABILITATION AND MODERNIZATION OF THE IRRIGATION NETWORKS OF THE LOCAL LAND IMPROVEMENT ORGANIZATION (TOEB) OF TAVROPOS

Country: Greece
Client: AVAX S.A. - AKTSOR S.A.
Year: 2024 - On Going
Funding: EU - National Funds

REHABILITATION AND MODERNIZATION OF THE IRRIGATION NETWORKS OF THE LOCAL LAND IMPROVEMENT ORGANIZATION (TOEB) OF TAVROPOS

Country: Greece
Client: AVAX S.A. - AKTSOR S.A.
Year: 2024 - On Going
Funding: EU - National Funds

The Tavropos irrigation project began construction in 1963 and began operating gradually from 1965, and was completed in 1973. In 1987, the project was expanded to 2,500 ha in the A’ Canals zone. In 1992, it was expanded to zones B’ and C’ with an irrigable area of 7,100 acres. The perimeter of the project amounts to 160,000 ha and the irrigable area to approximately 120,000 ha.
The water supply to the Tavropos irrigation project is provided by the Tavropos reservoir (Lake Plastira) through the Plastira Hydroelectric Station and the flow is regulated through a regulating tank with a capacity of 600,000 m3, which has been operating since 1965. The maximum water level in the tank (A.S.Y.) is +188.10 m. The maximum water discharge capacity at the Tavropos irrigation project is 16 m3/sec.
Z&A is responsible for the rehabilitation design of the total irrigation network. The network is divided into primary, secondary and tertiary. The primary network consists of the main transmission pipelines that follow the layout of the feeder canal. The secondary network consists of the transmission pipelines that branch off from the primary network and end at the water intake points of the tertiary network. The tertiary network is the distribution network in which the water intakes are placed to supply water to the agricultural area.
The total length of the primary network is approximately 23.0 km, the secondary network is 92.7 km and the tertiary network is 679.8 km (Sum 795.5 Km) The diameter of the pipes range from DN140 -DN2000.
Two pumping station are suggested (270 m3/hr and 702m3/hr)

The service covers the field of:
Field surveys – Soil surveys in areas
Hydraulic Study of the new network
Hydrological Study
Geotechnical Study
Detail Design Study
Tender Documents

IRRIGATION NETWORK OF YPERIA, LARISSA PREFECTURE – ORFANA, KARDITSA PREFECTURE

Country: Greece
Client: METLEN S.A.
Year: 2024 - On Going
Funding: EU - National Funds

IRRIGATION NETWORK OF YPERIA, LARISSA PREFECTURE – ORFANA, KARDITSA PREFECTURE

Country: Greece
Client: METLEN S.A.
Year: 2024 - On Going
Funding: EU - National Funds

The contract signed by METLEN SA and the ministry concerns the study, construction, financing, maintenance and operation of an irrigation network at the Yperia – Orfana location for the irrigation of the lowland areas adjacent to the Enipeas River mentioned in the wider Yperia area of ​​Larissa Prefecture, as well as Orfana in Karditsa Prefecture, with a total area of ​​74,300 ha, where the Local Land Improvement Organizations (TOEB) of Titani and Farsala operate. More specifically, eleven individual irrigation networks are proposed that will irrigate a gross area of ​​74,300 ha, a net area of ​​approximately 67,800 ha, and will utilize boreholes, with a total capacity of 14,345 m3/hour. Z&A is responsible for the study of the network of the above mentioned irrigation area. The total irrigation network is 325,138 m with the diameters of the pipes (HDP) ranging from DN 110 to DN 800.

The service covers the field of:
Field surveys – Soil surveys in areas
Hydrological Study
Detail Design Study
Climate Change Study
Geological Study and Geotechnical Study
Prepare O&M Plan and Quality Management Plan
Prepare Tender Documents

FINAL STUDY FOR THE PROJECT TITLE: STRENGTHENING OF THE WATER SUPPLY OF THE MUNICIPALITY OF KARDAMENA BY THE “MIA” RESERVOIR

Country: Greece
Client: Municipal Enterprise Water Supply And Sewerage of the Municipality of Kos
Year: 2025 - On Going
Funding: National – EU Funds
Contract Value: 622,150.00 € (~717,889.00USD)

FINAL STUDY FOR THE PROJECT TITLE: STRENGTHENING OF THE WATER SUPPLY OF THE MUNICIPALITY OF KARDAMENA BY THE “MIA” RESERVOIR

Country: Greece
Client: Municipal Enterprise Water Supply And Sewerage of the Municipality of Kos
Year: 2025 - On Going
Funding: National – EU Funds
Contract Value: 622,150.00 € (~717,889.00USD)

The island of Kos is the third largest island in the Dodecanese and the second most populous. According to the 2021 census, it has 37,089 permanent residents, with the population increasing significantly during the tourist season, which in recent years has extended from April to October. The Municipal Unit of Irakleida, in which the project un-der study is planned to be constructed, has a population of 7,467 permanent residents, of whom 2,132 live in the Municipal Community (MC) of Kardamena, 2,622 in the MC of Antimachia and 2,713 in the MC of Kefalos. It is noted that during the summer months the number of tourists exceeds 50,000.
The main characteristics of the dam and the watershed are as follows:
Dam Height 22.0 m, Homogenous Clay Core, Dam Volume (m3) 141.300 , Reservoir Volume 1.24 hm3
The capacity of the Water Treatment Plant which will be designed is 5.000m3/d, The pumping station 250m3/h

The scope of the service consists of:
Detail Design
Hydrological Investigation
Geotechnical Investigation
Geological Investigation
Topographical Survey
WTP Design
Electromechanical design
Road Design
ESIA

TECHNICAL ADVISOR FOR THE DESIGN AND PREPARATION OF THE CONSTRUCTION PERMIT ISSUE AND THE CONSTRUCTION TENDER PACKAGE FOR THE UPGRADE AND EXTENSION OF THE NATIONAL ARCHAEOLOGICAL MUSEUM OF GREECE

Country: Greece
Client: Ventourakis - Tavaniotis and associates S.A., “BETAPLAN”
Year: 2024
Funding: Private
Contract Value: 20,000.00 € (~23,051.00USD)

TECHNICAL ADVISOR FOR THE DESIGN AND PREPARATION OF THE CONSTRUCTION PERMIT ISSUE AND THE CONSTRUCTION TENDER PACKAGE FOR THE UPGRADE AND EXTENSION OF THE NATIONAL ARCHAEOLOGICAL MUSEUM OF GREECE

Country: Greece
Client: Ventourakis - Tavaniotis and associates S.A., “BETAPLAN”
Year: 2024
Funding: Private
Contract Value: 20,000.00 € (~23,051.00USD)

The project was part of the review of the Preliminary Study for the diversion of Kyklovoros stream, a sub-project of the Upgrade and expansion of the Hellenic National Archaeological Museum of Greece. Z&A reviewed the hydrological studies and also the hydraulic study of the nearby sewerage network

TECHNICAL CONSULTANT SERVICES FOR THE UPDATE OF THE HYDROLOGICAL AND OPERATIONAL STUDY OF THE IASMOS RESERVOIR

Country: Greece
Client: Eastern Macedonia Thrace Region
Year: 2024
Funding: National – EU Funds
Contract Value: 30,876.00 € (~35,586,00 USD)

TECHNICAL CONSULTANT SERVICES FOR THE UPDATE OF THE HYDROLOGICAL AND OPERATIONAL STUDY OF THE IASMOS RESERVOIR

Country: Greece
Client: Eastern Macedonia Thrace Region
Year: 2024
Funding: National – EU Funds
Contract Value: 30,876.00 € (~35,586,00 USD)

The purpose of the construction of IASMOS Dam is to serve the irrigation needs of the western region of the prefecture, covering a total area of 200,000 ha. This study concerns the update of the operating balance of the Iasmos reservoir, with the aim of updating the environmental study of the project. According to the 2010 hydrological study, the total area of the basin at Vistonida amounts to 596.1 km2, and the drainage basin at the location of the dam under consideration amounts to 537.7 km2.

Z&A performed the hydrological study update

STUDY FOR THE RESTORATION/CREATION OF AN ECOLOGICAL PARK OF LAKE TELMATON AT THE MINING FACILITIES OF THE OLYMPIADA MINE OF THE KASSANDRA MINES OF THE COMPANY HELLINIKOS CHRYSOS IN THE PREFECTURE OF HALKIDIKI HELLINIKON – NORTH GREECE

Country: Greece
Client: Doxiadis +
Year: 2024 - On Going
Funding: Private Funding
Contract Value: 30,000.00 € (~34,576.00USD)

STUDY FOR THE RESTORATION/CREATION OF AN ECOLOGICAL PARK OF LAKE TELMATON AT THE MINING FACILITIES OF THE OLYMPIADA MINE OF THE KASSANDRA MINES OF THE COMPANY HELLINIKOS CHRYSOS IN THE PREFECTURE OF HALKIDIKI HELLINIKON – NORTH GREECE

Country: Greece
Client: Doxiadis +
Year: 2024 - On Going
Funding: Private Funding
Contract Value: 30,000.00 € (~34,576.00USD)

The mining activity of the Kassandra Mines takes place in the wider area of NE Halkidiki, within the administrative boundaries of the Municipality of Aristotelis and with the operator being “HELLENIC GOLD SOLE ENTITY S.A. OF GOLD MINES AND INDUSTRY”. The project includes interventions of approximately 4,900 ha extending within a to-tal mining concession of 264,000 ha. The Olympiada Project concerns the development of an existing gold-bearing mine of mixed sulphide minerals, with a mining capacity of 12.38×106 tn of ore, exclusively by underground exploi-tation. Part of the above Project is also the environmental restoration of the old Olympiada mining tailings deposit area (Olympiada Tailings Lake). The area to be restored covers an area of 265 ha. In the context of the environ-mental restoration of Lake Telmaton, Olympiada, an Ecological Meta-Industrial Park will be studied and implement-ed, with the aim of creating terrestrial and wetland ecosystems, both to enhance biodiversity and to attract a new tourism model: naturalism, industrial archaeology and culture.
It proposes the formation of surfaces at a rate of 60% with earthworks (excavations – embankments – leveling), the formation of pedestrian routes (mild intervention) at a rate of 10%, and light architectural structures (estimated 500m2), the creation of a new habitat and the preservation and promotion of industrial fragments as sculptural ele-ments. Emphasis will be given to environmental awareness, sports and play.

The scope of the service consists of:
• Investigation of the creation of wetlands by exploiting surface and/or groundwater.
• Description of the current state of groundwater and surface waters in the tailings lake, including the upstream and downstream sections of the Mavrolakkas River, depending on the requirements.
• Investigation of the passage of a stream within the new Park and provision of hydraulic works to create wet-lands from the surface runoff of the Mavrolakkas River.
• Technical solution for the creation of wetlands in the tailings lake.

CHAVRIA IRRIGATION NETWORKS STUDY

Country: Greece
Client: Ministry of Transport and Infrastructure
Year: 2025 - On Going
Funding: National Funding - EU FUNDING
Contract Value: 1,886,000.00 € (~2,120,400.00 USD)

CHAVRIA IRRIGATION NETWORKS STUDY

Country: Greece
Client: Ministry of Transport and Infrastructure
Year: 2025 - On Going
Funding: National Funding - EU FUNDING
Contract Value: 1,886,000.00 € (~2,120,400.00 USD)

The contract concerns the preparation of the Irrigation Study of a net agricultural area of 24,000 Ha in the Ormylia plain area of Chalkidiki, as well as the related water intake works such as the Transmission pipelines with a total length of approximately 6.0 km, Three (3) tanks of different storage volumes (20,000, 7,000 and 5,000), Six (6) Irrigation Pumping Stations and three boreholes.
Within the framework of the irrigation networks, the drainage system is also being designed, which is discharged into the streams of the area – Twelve (12) streams, including the river Chavria – Catchment areas ranging from 0.50 km2 to 75.0 km2 (area of Chavria 475.3 km2) – Total length of regulated approximately 27 km – Regulating projects within and within residential areas
In summary, the required studies are as follows:
• Agricultural and Feasibility Studies
• Hydraulic Studies in two stages: Stage 1 Preliminary Study and Stage 2 Deatail Design.
• Electromechanical Studies in two stages: Stage 1 Preliminary Study and Stage 2 Detail Design
• Topographical Works and Studies
• Geological Surveys and Studies
• Geotechnical Investigations and Studies
• Static Studies
• Environmental Impact Study
• Preparation of Tender Documents

DESIGN OF THE TRACHONES STORM WATER NETWORK BASED ON THE METROPOLITAN PARK LANDSCAPE DESIGN

Country: Greece
Client: HELLINIKON S.M.S.A.
Year: 2023 - On Going
Funding: Private Funding
Contract Value: 30,000.00 €

DESIGN OF THE TRACHONES STORM WATER NETWORK BASED ON THE METROPOLITAN PARK LANDSCAPE DESIGN

Country: Greece
Client: HELLINIKON S.M.S.A.
Year: 2023 - On Going
Funding: Private Funding
Contract Value: 30,000.00 €

The Hellinikon Metropolitan Park (also called “the Ellinikon”) is an urban development under construction in Hellinikon, Athens, Greece, on the site of the former Hellenikon International Airport. It is to include a park as well as luxury homes, hotels, a casino, a marina, shops, and offices and will have Greece’s tallest buildings reaching up to 200 metres (660 ft) in height.

Under this contract Z&A shall review, assess, modify, adjust, revise – update, as necessary, the studies related to the Trachones stream of the Metropolitan Pole. The Deliverables include the detailed design of the following disciplines: Stormwater Networks design, Civil Engineering and Structural design, including Cost Estimation of all scope areas and disciplines.
In more detail the deliverables include:
a. Hydraulic calculations for both the normal and extreme events scenario;
b. Horizontal alignment layouts and sections of the proposed culverts and the swales, including the additional swales designed by the MLA;
c. General arrangement plans of stormwater networks;
d. Catchment areas layouts;
e. Cross sections/ profiles, including coordination sections of the Trachones stream at the connection points with the proposed culverts by the MLA;
f. Details of stormwater manholes, curb & median inlet, channel discharge, overflow control;
g. Typical box culvert sections and drainage pipe trenches;
h. Typical cross sections and profiles, including lining materials;
i. Reinforcement of channels and channel discharge;
j. Reinforcement of box culverts and inlets;
k. Structural calculations & structural technical report;
i. Structural design for the required special structures;
m. Geotechnical study for the structural foundations and slopes stability;
n. Bill of quantities and cost estimation affording all areas and disciplines.

1st REVISION OF FLOOD RISK MANAGEMENT PLANS FOR THE CENTRAL AND WESTERN MACEDONIA RIVER BASINS – IMPLEMENTATION OF E.U. DIRECTIVE 2007/60/EC

Country: Greece
Client: GENERAL DIRECTORATE for WATER
Year: 2022 - In progress
Funding: EU Funds, National Funds
Contract Value: 2.361.416 € (2.573.943 USD)

1st REVISION OF FLOOD RISK MANAGEMENT PLANS FOR THE CENTRAL AND WESTERN MACEDONIA RIVER BASINS – IMPLEMENTATION OF E.U. DIRECTIVE 2007/60/EC

Country: Greece
Client: GENERAL DIRECTORATE for WATER
Year: 2022 - In progress
Funding: EU Funds, National Funds
Contract Value: 2.361.416 € (2.573.943 USD)

TThe project concerns the implementation of the Directive 2007/60/EC of the European Community on the assessment and manage-ment of flood risk at the Greek part of the Central and Western Macedonia River Basin Districts (RBDs).
Western Macedonia RBD (EL09) includes the River Basins of Prespes catchment and Aliakmonas, covering a total area of 13.620 km2. The most important catchments are Aliakmonas river (8.813 km2), enclosed catchment of Ptolemaida (2.133 km2), the transboundary Axios river (863 km2) and Esonas river (815 km2). The most important river water body is Aliakmonas while its flow is regulated by 5 reservoirs. The RBD’s main land cover is forestry (56%) followed by agriculture (39%). Western Macedonia is the most significant Prefecture of Greece regarding its electricity production with a total of 13.078 MW installed thermal and hydro power. Central Macedonia RBD (EL10) includes the River Basins of Axios, Gallikos, Chalkidikis and Athos covering a total area of 10.165 km2. The most important catchments are Thessaloniki Lakes (2.161 km2), the transboundary Axios river (1.636 km2), Loudias river (1.251 km2) and Gallikos river (1.055 km2). The most important river water body is Axios, flowing into Greece from Northern Macedonia. The prefecture of Central Macedonia comprises the main road and rail portal of Greece to the Balkans. Central Mace-donia hosts important infrastructure, including ports, airports, motorways and railroads. Moreover, the southern and eastern part of EL10 is characterised by important urban, industrial and tourism development.
The study aims at assessing future flood risks, based on historic information and detailed hydrologic analyses and hydraulic modelling, in order to propose administrative measures and civil protection actions that will allow for reducing the impact of flooding events in the future.

The services cover the implementation of all provisions of the 2007/60/EC Directive in the Greek part of the Western Macedonia RBDs. In more detail, the assignment concerns the articles 6, 7, 9 and 10 of the Directive and has the following stages:
– Part I: Flood Hazard Maps and Flood Risk Maps (Art. 6 of 2007/60/EC). The Consultant performs a thorough analysis of hydro-logical data and identifies simulation scenarios and flooding discharges for low, medium and high probality events, in order to create 20 two-dimensional hydraulic models of the flood prone areas and produce maps demonstrating: (a) flood hazard, showing the flood extent and water depths; and (b) flood risk, showing the potential adverse effects of the different flooding scenarios on economic, cultural and environmental assets of the flooded area. The analysis is planned to finish by December 2023 and the relevant maps will be accessible to the public and reported to the European Union through the WISE (Water In-formation System for Europe) (Art. 9 of 2007/60/EC). Thw hydrological models are developed using HEC-HMS and the hydrau-lic simulations are run using 2D HEC-RAS analysis, for about 1,800km of river lengths.
– Part II: (1) Flood Risk Management Plans (Art. 7 of 2007/60/EC). The Consultant based on the results of the Flood Hazard and Risk Maps identifies reasonable objectives towards the management of flooding risk and proposes measures for achieving these objectives, in close collaboration with the Client. (2) Strategic Environmental Impact Assessment and Public Consultation (Art. 7,10 of 2007/60/EC and 2001/42/EC). The plans focus on all components of risk management, namely prevention, protec-tion and preparedness, as described above, and are accompanied by a strategic environmental impact assessment, which identifies and evaluates any likely impacts of the management plan to the environment. The Consultant is the coordinator of the Public Consultation aiming at the active participation of all the engaged stakeholders.
– For the completion of the study the Consultant needs to: update all existing geodatabases (GIS software) of hydrological and hydraulic information; develop a website for the public dissemination of the study findings and the provision of a dedi-cated discussion forum; prepare documents and databases for reporting in the EU WISE tool.
Among the preparatory activities for the elaboration of the assignment are the update of the intensity-duration-frequency rainfall curves, including recent records, as well as the preparation of a digital terrain model of high accuracy, based on already available datasets, to be used for the two-dimensional hydraulic models.

2ND REVISION OF ΤΗΕ WATER RESOURCES MANAGEMENT PLANS OF THE RIVER BASINS IN THE 14 RIVER BASIN DISTRICTS OF GREECE ACCORDING TO SPECIFICATIONS OF THE E.U. DIRECTIVE 2000 /60/EC. SECTION 1: “2ND REVISION OF THE MANAGEMENT PLAN OF RIVER DRAINAGE BASINS OF THE AQUATIC DIVISIONS OF WESTERN PELOPONNISOS (EL01), NORTHERN PELOPONNISOS (EL02) AND EASTERN PELOPONNISOS (EL03)”

Country: Greece
Client: GENERAL DIRECTORATE FOR WATER
Year: 2022 - In progress
Funding: EU Funds, National Funds
Contract Value: 1,407,096 € (1,528,986 USD)

2ND REVISION OF ΤΗΕ WATER RESOURCES MANAGEMENT PLANS OF THE RIVER BASINS IN THE 14 RIVER BASIN DISTRICTS OF GREECE ACCORDING TO SPECIFICATIONS OF THE E.U. DIRECTIVE 2000 /60/EC. SECTION 1: “2ND REVISION OF THE MANAGEMENT PLAN OF RIVER DRAINAGE BASINS OF THE AQUATIC DIVISIONS OF WESTERN PELOPONNISOS (EL01), NORTHERN PELOPONNISOS (EL02) AND EASTERN PELOPONNISOS (EL03)”

Country: Greece
Client: GENERAL DIRECTORATE FOR WATER
Year: 2022 - In progress
Funding: EU Funds, National Funds
Contract Value: 1,407,096 € (1,528,986 USD)

The Water Resources Management Plans of the 14 River Basin Districts (RBDs) of Greece are prepared according to the provisions of the 2000/60/EC Directive and are revised every six years. The 2nd revision of the Water Resources Management Plans in the RBDs of Western, Northern and Eastern Peloponnese (RBD01, RBD02 and RBD03) concerns a total area of about 23,100km2. It examines both surface water bodies and groundwater bodies and includes the following activities:
1) Modification, completion and bringing up to date previous actions on implementing Articles 3, 5, 6, 7, 8, 11 and 13 of the WFD in the two RBDs.
2) Preparing the necessary reports and GIS files, as well as databases of information regarding the condition of water bod-ies; manmade pressures on water bodies (in terms of water demand, ecology, biology and pollution); water availability and abstractions; ecological and biological indicators etc.
3) Review and update of the working Water Management Tools of the Ministry of Environment, including the hydrological analysis of rainfalls, the calculation of water yields for all surface water and groundwater bodies and the preparation of water balance models for all surface water bodies basins, taking into account the existing and estimated future water de-mands. All analyses were elaborated using the MIKE software.
4) Preparing a Strategic Environmental Impact Assessment for the actions and measures proposed in the RBD Management Plan.
5) Organizing and participating in the public consultation process with the RBD stakeholders as prescribed in the WFD, prior to the publication of the final management plan.
6) Completing the national database systems with the updated information.
7) Preparing the necessary files for reporting the results to the European Commission (WISE).
8) Publishing the River Basin District Management Plans on internet and disseminating it findings to the public using various sources of information (internet, press releases, national and international workshops etc.)
9) Creating an internet site for the dissemination of the study, including a discussion forum.
10) Publishing documentations on climate change and other environmental issues.

The services cover the fields of:
– Collection of all relevant environmental, ecological, biological, hydrological and hydro geological information.
– Collection of all available information regarding water demand and water pollution from various sources.
-Analysis of projects already developed or under development, and estimation of the current and future water uses (for the 6yrs timeframe of the project).
-Development of updated hydrological and water management tools regarding the rainfall patterns, the yields of the catchments and the water balance models of all surface and groundwater bodies in the study area.
-Development and evaluation of an Economic Model regarding water uses, cost of water and environmental costs.
– Provision of a series of preventive and protective measures for water resources.
– Preparation of databases, update of information platforms, development of website.
– Workshops, training courses, internet site, documentation and manuals.