Albania

CONSULTANCY SERVICES FOR SUPERVISORY SERVICES FOR REHABILI-TATION WORK OF SIX IRRIGATION SCHEMES (TREGTAN2, TREGTAN3, LEMINOT, SLANICA, MURIZ THANA CUKAS BRANCH AND MURIZ THANA LUSHNJA LOT 1 BRANCH)

Country: Albania
Client: The Ministry of Agriculture and Rural Develop-ment (MARD)
Year: 2019 - 2020
Funding: ODA funded by IBRD_IDA
Contract Value: 406,500.00 € (~460,811.00 USD)

CONSULTANCY SERVICES FOR SUPERVISORY SERVICES FOR REHABILI-TATION WORK OF SIX IRRIGATION SCHEMES (TREGTAN2, TREGTAN3, LEMINOT, SLANICA, MURIZ THANA CUKAS BRANCH AND MURIZ THANA LUSHNJA LOT 1 BRANCH)

Country: Albania
Client: The Ministry of Agriculture and Rural Develop-ment (MARD)
Year: 2019 - 2020
Funding: ODA funded by IBRD_IDA
Contract Value: 406,500.00 € (~460,811.00 USD)

Albania is facing one of the most challenging jobs in comprehensive Irrigation water management, dealing with maintain, and upgrade the irrigation and drainage (I&D) infrastructures. The mostly of the existing irrigation areas requires to be improved according a cost-effectiveness solution.
The Ministry of Agriculture of the Rural Development (MARD) has launched the Water Resources and Irrigation Pro-ject (WRIP)” whose mission is to increase the Government capacity to manage water resources and to improve the performance of the irrigation system and irrigation institutions.
The scope of the project was to rehabilitate the following irrigation schemes Tregtan2, Tregtan3, Leminot, Slanica, Muriz Thana Cukas Branch and Muriz Thana Lushnja (Lot 1 Branch). Total Irrigation serve 12,500.00 ha

The scope of service in brief included:
The services can be summarized in three main phases:
• Pre-Construction Phase
• Design Review
• Construction Phase
Below the list of the main activities performed:
Pre-Construction Phase
Mobilization of Supervision Team
Establishment of Supervision Framework
Establishment of the Quality Management System and preparation of the Special Construction Quality Supervision Procedures
Design Review
Review of base documentation included in the Detail Design
Review of Bidding Document
Adjust existing project documents according the review result
Construction Phase/Contract Administration
Works Supervision
Financial Management of the Works
Monitoring of the progress of the works
Management of Variations
Management of Claims