Greece

Our projects in Greece

Detailed engineering design and tender documents for the construction of setta – manikia dam, evoia island, central greece

Country: Greece
Client: -
Year: 1994 - 1997
Funding: -
Contract Value: -

Detailed engineering design and tender documents for the construction of setta – manikia dam, evoia island, central greece

Country: Greece
Client: -
Year: 1994 - 1997
Funding: -
Contract Value: -

The objective of the study was the detailed design for the construction of the water supply and irrigation dam “Manikia” in Evia Perfecture, central Greece. Manikia dam was designed as an earthfill dam with a clay core and its basic technical characteristics are: – River Basin upstream of the dam: 13.60 km². – Elevation at the dam’s axis: +729 m in the river valley, +774 m at dam’s crest, +770 at dam’s f.s.l. – Total capacity of the dam: 2,602,000 m³, usefull capacity of the dam: 2,399,500 m³. – Dam’s height (at the axis): 54 m. – Irrigation area (downstream): 800 ha, water supply demand 3.43 hm³/year for Kymi and Aliveri cities. Construction of dam was ended at 2003. Now it is in full operational mode.
The objective of the study was the detailed design for the construction of the water supply and irrigation dam “Manikia” in Evia Perfecture, central Greece. It was designed as an earthfill dam with a clay core. The river basin upstream of the dam is 13.60 km². The total capacity of the dam is 2,602,000 m³. The dam’s height is 54 m, the irrigation area served 800 ha while the water supply demand 3.43 hm³/year for Kymi and Aliveri cities. From 2003 was set in full operational mode.

Feasibility study for irrigation network rehabilitation and flood protection of low relief valeys in aitoloakarnania prefecture, west greece

Country: Greece
Client: -
Year: 1993 - 1995
Funding: -
Contract Value: -

Feasibility study for irrigation network rehabilitation and flood protection of low relief valeys in aitoloakarnania prefecture, west greece

Country: Greece
Client: -
Year: 1993 - 1995
Funding: -
Contract Value: -

The project examined all the irrigation areas of Etoloakarnania Prefecture (areas of Messolonghi, Trichonida, Naupaktia, Valtou, Ksiromerou) and produced the following deliverables: – Feasibility design study for the rehabilitation of the existing irrigation networks. The existing total irrigated area covered approximately 7,000 ha and – Feasibility design study for the flood protection of low relief valeys of Etoloakarnania Prefecture.
The scope of the project was the Feasibility Design study for rehabilitating the existing irrigation networks of all the irrigation areas of Etoloakarnania Prefecture (areas of Messolonghi, Trichonida, Naupaktia, Valtou, Ksiromerou) and the flood protection of low relief valeys of Etoloakarnania Prefecture.

Detailed engineering design and tender documents for the construction of vrachos dam, kastoria prefecture, north greece

Country: Greece
Client: -
Year: 1992 - 1994
Funding: -
Contract Value: -

Detailed engineering design and tender documents for the construction of vrachos dam, kastoria prefecture, north greece

Country: Greece
Client: -
Year: 1992 - 1994
Funding: -
Contract Value: -

The scope of the contract was the detailed design for the construction of the irrigation dam “Vrachos” in Kastoria Perfecture, northwest Greece. Vrachos dam was designed as an earthfill dam with a clay core and its basic technical characteristics are: – River Basin upstream of the dam: 9.20 km². – Elevation at the dam’s axis: +920 m in the river valley, +959 m at dam’s crest, +955 at dam’s a.s.l. – Total capacity of the dam: 1,948,500 m³, usefull capacity of the dam: 1,733,000 m³. – Dam’s height (at the axis): 48 m. – Dam’s crest width 7.0 m, crest length 250.0 m. – Irrigation area (downstream): 465 ha. Construction of dam was delayed due to expropriation issues and was ended in 2007. Now it is in full operational mode.
The scope of the contract was the detailed design for the construction of the irrigation dam “Vrachos” in northwest Greece. It was designed as an earthfill dam with a clay core. The river basin upstream of the dam is 9.20 km². The total and useful capacity of the dam is 1,948,500 m³ and 1,733,000 m³ respectively. The dam’s height is 48 m and the irrigation area served is 465 ha.Construction of dam was ended in 2007. Now it is in full operational mode.