The diverse terrain crossed by the Egnatia Motorway together with the special environmental conditions encountered imposed the construction (provision for) 73 twin-bore road tunnels of an overall combined length of 100km (measured as single carriageway) measured at 50km of single carriageway. Veneticos tunnel was a 700 m long double bored tunnel lying immediate afterwards the Veneticos Bridge. The hydraulic design included the following: (a) surface road drainage and (b) drainage system to prevent flooding from upstream catchment areas along with the design of the necessary hydraulic structures (ditches, culverts, etc).
Veneticos tunnel was a 700 m long double bored tunnel lying immediate afterwards the Veneticos Bridge. The hydraulic design included the following: (a)water drainage system of the Venetikos tunnel (b) drainage system to prevent flooding from upstream catchment areas along with the design of the necessary hydraulic structures (ditches, culverts, etc).