A separate WWTP installation for disposal and treatment of industrial waste water was designed at the Sarakakis Industrial Area, in Athens.The object of this study involved full hydraulic and structural analysis, calculations, the relevant geotechnical study, the detailed design of the WWTP and preparation of the tender documents. Construction supervision was implemented through out the total construction period and after the completion of the project, initial testing was carried on. WWTP installation was implemented at the backside of the main building of Sarakakis Bro. S.A. and designed to accommodate the higher organic strength and solids content in the water. The installation was designed to serve the 650 employees of the company, one truck painting factory and one truck repair workshop.
A separate WWTP installation for disposal and treatment of industrial waste water was designed at the Sarakakis Industrial Area, in Athens.The object of this study involved full hydraulic and structural analysis, calculations, the relevant geotechnical study, the detailed design of the WWTP and preparation of the tender documents. Construction supervision was implemented through out the total construction period and after the completion of the project, initial testing was carried on.
