Irrigation development support project, construction, supervision of lusitu, mwoboshi and musakashi irrigation schemes

The overall objective of the assignment is the supervision of the construction works for three Separate Irrigation Schemes in Lucitu, Mwomboshi and Musakashi Areas in accordance with the International Federation of Consulting Engineers (FIDIC) Conditions of Contract. The assignment includes also the preparation of Operation and Maintenance Plans and Manuals in accordance with international standards and in application of the World Bank policy. The total net irrigation area covers 254ha in Lusitu, 1,008ha in Musakashi and 5,073ha in Mwomboshi.