The study concerned the detailed design of the irrigation system across the national motorway “Patra – Athens – Thessaloniki – Evzonon” in Almyros – Evagelismos section, that included the design of reservoirs and pumping stations, water resources management of drills and springs and the design of the irrigation water supply network and distribution. The total length of the under study section of the highway was about 90 km. Six (6) pumping stations with the nessecary wells and tanks were designed. A full scada system was designed for the automatic control of the irrigation network.
The study concerned the detailed design of the irrigation system across the national motorway “Patra – Athens – Thessaloniki – Evzonon” in Almyros – Evagelismos section, that included the design of reservoirs and pumping stations, water resources management of drills and springs and the design of the irrigation water supply network and distribution. The total length of the under study section of the highway was about 90 km.
