The project involved the detailed design studies for the upgrading and rehabilitation of storm water networks within the Kifissos River Drainage Basin covering a large part of the city of Athens. The following studies are the ones completed through the contract by Z&A: Detailed Design for Completion of the Existing Main Storm Network Pipe at Moschato, Kalithea and Nea Smyrni Areas on Eleftherias Street, Detailed Design for Discarding of Flood Projects in the General West Attica Hospital “Attikon”,Detailed Design for the Arrangement of Chaidari stream between the avenues Kavalas and Athinon, Peristeri Municipality, Detailed Design for the Main Storm Network Pipes of the Old Settlement in Acharnes Municipality.
The project involved the detailed design studies for the upgrading and rehabilitation of storm water networks within the Kifissos River Drainage Basin.The following studies are the ones completed through the contract by Z&A: Main Storm Network Pipe at Moschato, Kalithea and Nea Smyrni Areas on Eleftherias Street, Discarding of Flood Projects in the General West Attica Hospital “Attikon”, Realigment of Chaidari stream, Peristeri Municipality, Main Storm Network Pipes of Acharnes Municipality.
