The overall objective of the study is to undertake a prefeasibility study covering the entire study area(19 sites) and to continue with feasibility studies and detailed designs of multiple land husbandry, dam and hillside irrigation schemes at selected sites with a total net area of 3,500 ha (total gross area of 4,200 ha). The sites will be located at different parts of Rwanda and the studies will be carried out in two parts.The study will aim to produce cost effective and socially acceptable designs. Maps and summary reports of potential sites that have already been identified by the Land Husbandry, Water Harvesting and Hillside Irrigation (LWH) Project will be made available to the Consultant. Lot 1 sites are located within the boundaries of the Eastern and Northern provinces of Rwanda.Finally a feasibility study of an HPP of 0.2 MW will prepared. The project is to be tendered.