Preliminary studies for the construction of two (2) small hydroelectric plants at kirfi and elikona mountains

The scope of the project was the study for the tender phase of two small hydroelectric power stations on the Mornos channel, which supplies water to the greater Athens area. The energy produced is almost 800 KWh in each site and the locations of the small hydroelectric stations were proposed on the energy downfall parts of the channel. Both projects were constructed in the Mornos aqueduct near energy dispatch channel, with the necessary modifications of existing installations to avoid active interventions in the environment but also problems in the operation of the aqueduct. The design flow was Q = 14 m3/s in each site and drop 12,2 m in Kirfi HPP and 10,0 m in Elikonas HPP. The energy production was 1.4 MW and 1.17 MW, approximately.
The scope of the project was the study for the tender phase of two small hydroelectric power stations on the Mornos channel, which supplies water to the greater Athens area. The design flow was Q = 14 m3/s in each site and drop 12,2 m in Kirfi HPP and 10,0 m in Elikonas HPP. The energy production was 1.4 MW and 1.17 MW, approximately.