The contract involved the following studies and services for the water supply modernization of Athens network: 1) Increase the technical and institutional capacity of the Client in managing the water supply system of the greater Athens area, consisting of an aqueduct of about 300 km long, 2) Upgrading, modeling and redesigning of the Unified Aqueduct of Athens, 3) Development of the Water Supply Master Plan of the Greater Area of Athens 4) Feasibility study for the completion of the aqueduct Marathona – Yliki – Mornos (section Klidi – Dafnoula), 5) Feasibility study for the additional aqueduct from the exit of Kithaironas tunnel up to Acharnes D2000, 6) Completion of the detailed study of the last part of the repaired chlorination aqueduct in Helidonou area and construction of new bypass, 7) Feasibility study for the construction of a chlorination reservoir and a pumping station for water transfer from lake Marathonas in the region Helidonous, Acharnes, Athens, 8) Water Resources Management study for the Evinos river basin and for the total area of Etoloakarnania Prefecture and Water Resources Management study for Mornos river basin and for the total area of Fokida Prefecture,9) Environmental studies for all the above and hygiene education training programs for the Service.
The contract provided technical assistant to the client regarding the water supply of greater Athens area, about 300 km long. During the services the following activities were conducted: Water Supply Master Plan and Model, feasibility study and detailed design of several subsystems of the network, Water Resources Management study of Etoloakarnania and Fokida Prefectures, Environmental studies and hygiene education training programs for the Service, increase the institutional capacity of the Client.