Z&A as a partner of W.S. ATKINS INTERNATIONAL was involved in various hydraulic issues arising from the dam’s construction at Evinos River in West Greece such as checking contractor’s studies, consulting over various construction issues, etc. Works started in 1992 with the construction of the diversion tunnel and ended in July 2002 and launched the first filling of the reservoir of the Dam, which was completed in October 2002. The dam was designed to supply (through a 29.4 km tunnel) the reservoir of the Mornos Dam Reservoir of Athens and consists of an internal clay core, downstream gravel filters in order to prevent leakages and protective large stone bed in upstream side. Z&A was responsible for the review of all the Hydraulic detailed designs, submitted by the Contractor and also provided to the on site team, the Resident Engineer, the Chief Hydraulic and Structural Engineer.
Various hydraulic issues arising from the dam’s construction at Evinos River in West Greece such as checking contractor’s studies, consulting over various construction issues, etc. The dam supplies through a 29.4 km tunnel the reservoir of the Mornos Dam Reservoir of Athens. Z&A was responsible for the review of all the Hydraulic detailed designs, submitted by the Contractor and also provided to the on site team,the Resident Engineer, the Chief Hydraulic and Structural Engineer.