The contract dealt with the phase B of water control study of the municipality of Heracleio and other municipalities in the area which are going to be supplied with water from Aposelemis Dam. Phase “B” focused in the developing of a control system for the better operation of the water network of the total city area and reduce leakage which was estimated to be in the area of 50%. The city of Heracleio has a population that exceeds 305,000 inhabitants. Services included all strategic and analytical models, maps and GIS information, proposals on a replacement program of old pipes and valves of the network, proposals on leakage detection processes and illegal connections tracking, proposals on network monitoring, etc.