The contract signed included the study of flood control works downstream of the Corinth-Patras road axis, for the three streams Kolones (Total length 850m), Arachovitiko (Total length 950m), and Tholopotamos (Total length 350m).The study is the Final Hydraulic Study for the realignment works of the Arachovitiko stream (Chainage 36+454.53) from Ch. 0+000 (sea) to Ch. […]