Construction Supervision Services

CONSULTANCY TO CONDUCT REVIEW OF DETAILED DESIGNS, FEASIBILITY STUDY, DETAILED DESIGN STUDIES AND CONSTRUCTION SUPERVISION OF IRRIGATION SCHEMES IN BLANTYRE, BALAKA, DEDZA, MACHINGA, CHIKWAWA AND THYOLO DISTRICTS

The new irrigation schemes that were assessed through this consultancy were separated into two groups. Group A sites: Kasangadzi, Mazame and Nkawinda Group B sites: Utale, Kamwaza, Khwisa, Lisungwi, Phandiro, Ndundumale, Nkhawazantha and Ulande. The objectives of the assignment were: a)         Review existing studies and reports for the Group A (480 ha) irrigation schemes b)         […]

SELECTION OF CONSULTING SERVICES FOR SUPERVISION AND CONTRACT ADMINISTRATION OF ADDIS ABABA CITY WATER DISTRIBUTION SCADA SYSTEM PROJECT

The scope of this consultancy service includes all contract administration and supervision activities required during detail design, supply and installation of the centralized SCADA system. Z&A is responsible for managing the contractor’s activities with the required quality and completion of the project on an agreed timeline. Z&A is responsible for supervision of the following contractor’s […]

CONSTRUCTION SUPERVISION OF THE REMAINING WORKS FOR THE LUSITU, MUSAKASHI SOUTH AND MUSAKASHI NORTH IRRIGATION SCHEMES, INSTALLATION OF COMMUNITY WATER FOR LUSITU & MUSAKASHI SOUTH AND THE PROCUREMENT OF SPARES FOR THE THREE IRRIGATION SCHEMES

This Consulting Services for Construction Supervision and Preparation of O&M Plans were for the Lusitu, Musakashi South and North Irrigation Schemes situated in Chirundu and Mufulira Districts, respectively. The services also included the supervision of the water supply installation for the Musakashi South and Lusitu communities as well as supervising the procurement of spares for […]

CONSTRUCTION SUPERVISION OF THE MWOMBOSHI DAM AND PREPARATION OF DAM SAFETY PLANS

The overall objective of the assignment was the supervision of the construction works for the Mwomboshi Dam and appurtenant structures in accordance with the International Federation of Consulting Engineers (FIDIC) Conditions of Contract. The Mwomboshi site developed on both banks of the Mwomboshi River, in Chisamba District in Central Province to the east of the […]

Ταυ 20/2020 – provision of consulting services for the supervision of the construction of the kammitsi and archangelos dam

The overall objective of the assignment is the supervision of the construction works for the Kamitsi and the Archagelos Dams and appurtenant structures in accordance with the International Federation of Consulting Engineers (FIDIC) Conditions of Contract. Both Dams are constructed to prevent flooding events in the wider area of LarnacaThe Kamitsi Dam is a composite […]