Sewage and Wastewater

Provision of consultant services for complementary and new studies, preparation of tender documents, evaluation of tenders, supervision of construction works of the sewage system in government settlements and settlements in limassol

The main objective of the Sewerage Board of Limassol – Amathus (SBLA) is the construction, operation and maintenance of the public sewerage and stormwater drainage system of the Greater Limassol Area and therefore to improve the hygienic and environmental conditions and the quality of life in the area. The scope of the service includes the […]

DEVELOPING AN INTEGRATED URBAN WATER MANAGEMENT MASTER PLAN FOR MARONDERA MUNICIPALITY

The overall project goal was to provide the Municipality of Marondera with an innovative and integrated approach that will ensure the sustainable management of water and sanitation for Marondera’s population. The project objective was to develop an Integrated Urban Water Management Master Plan for Marondera Municipality for a 20-year horizon which will pave way for […]

Developing an integrated urban water management master plan for marondera municipality

The overall project goal is to provide the Municipality of Marondera with an innovative and integrated approach that will ensure the sustainable management of water and sanitation for Marondera’s population. The main project objective is to develop an Integrated Urban Water Management Master Plan for Marondera Municipality for a 20-year horizon which will pave way […]

Selection & employment of consulting services for feasibility study and detail design of waste water management system for mekelle, adama & dire dawa towns

The sanitation systems of three large cities Mekelle, Adama and Dire Dawa, are to be examined under this project. The scope of services includes: Assessment of existing sanitation situation and infrastructure work Feasibility Studies and Detail Design of the new proposed system (and Tender Documents) Conceptual Plan and Design Criteria Design Components Affordability and Cost […]

Feasibility study of water and wastewater treatment plant sludge reuse

This project will help AAWSA to assess the upcoming problem of sludge disposal and to organize the required financial and technical future actions. The assignment focused on a)the assessment of the volume of sludge production at different water and waste water treatment plants in Addis Ababa, b) the preparation of conceptual engineering designs and estimated […]