Storm Water Networks and Flood prevention

TECHNICAL CONSULTING SERVICES FOR FEASIBILITY STUDIES, DESIGNS, AND SUPERVISION FOR THE REGIONAL CLIMATE RESILIENCE PROGRAM IN SOUTH SUDAN / SS-MWRI-373355-CS-QCBS

South Sudan experiences frequent and intense floods and droughts. The country is a global hotspot of flood risk, ranking 7th in the world for share of population exposed to riverine floods. Significant floods in 2019 and 2020 were surpassed by record floods in 2021, which affected between 800,000 to 1.2 million people and displaced more […]

CONSULTANCY SERVICES FOR UP‐SCALING THE SHIRE RIVER OPERA-TION DECISION SUPPORT SYSTEM (ODSS) THROUGH ENHANCED HY-DROMET NETWORK SYSTEM IN MALAWI

The main objective was to create a connection between the results produced by the Shire River Operation Decision Support System (ODSS) software and the KABOM (Kamuzu Barrage Operation and Management Model) management tool so that the hydrological information produced and data collected by the ODSS can be directly in-gested into KABOM to improve and facilitate […]

1st REVISION OF FLOOD RISK MANAGEMENT PLANS FOR THE CENTRAL AND WESTERN MACEDONIA RIVER BASINS – IMPLEMENTATION OF E.U. DIRECTIVE 2007/60/EC

TThe project concerns the implementation of the Directive 2007/60/EC of the European Community on the assessment and manage-ment of flood risk at the Greek part of the Central and Western Macedonia River Basin Districts (RBDs). Western Macedonia RBD (EL09) includes the River Basins of Prespes catchment and Aliakmonas, covering a total area of 13.620 km2. […]

2ND REVISION OF ΤΗΕ WATER RESOURCES MANAGEMENT PLANS OF THE RIVER BASINS IN THE 14 RIVER BASIN DISTRICTS OF GREECE ACCORDING TO SPECIFICATIONS OF THE E.U. DIRECTIVE 2000 /60/EC. SECTION 1: “2ND REVISION OF THE MANAGEMENT PLAN OF RIVER DRAINAGE BASINS OF THE AQUATIC DIVISIONS OF WESTERN PELOPONNISOS (EL01), NORTHERN PELOPONNISOS (EL02) AND EASTERN PELOPONNISOS (EL03)”

The Water Resources Management Plans of the 14 River Basin Districts (RBDs) of Greece are prepared according to the provisions of the 2000/60/EC Directive and are revised every six years. The 2nd revision of the Water Resources Management Plans in the RBDs of Western, Northern and Eastern Peloponnese (RBD01, RBD02 and RBD03) concerns a total […]

CHALKIDA TO PSAHNA BY-PASS ROAD

The scope of the Contract was divided into three parts: The service covered the filed of:Field surveysDetail Design StudyTender Documents