CONSULTING SERVICES FOR UPDATING THE EXISTING STORMWATER DRAINAGE STUDIES, THE PREPARATION OF BIDDING DOCUMENTS, THE EVALUATION OF TENDERS AND THE SUPERVISION OF CONSTRUCTION OF THE GREATER LIMASSOL AREA

The main objective of the Sewerage Board of Limassol – Amathus (SBLA) was the construction, of the stormwater drainage system of the Greater Limassol Area (1,261ha area). The anti-flood works comprise 20,8 km of drainage system. The pipelines consisted of concrete pipes (D500-D1200) of 17.869 km length and box culverts (200 X 100 up to […]

Sarako solar farm land drainage study

A photo-Voltaic (PV) solar farm is set up by Sarako PVP Co Ltd. on a site of extent 80A along the lower slopes of St. Pierre Mountain, Mauritius. The objective of this assignment was to re-assess storm water runoff conditions and propose the implementation of watershed measures, as the cut off trench that was was […]

Port louis drainage study

The analysis included interconnected rural and urban catchments, covering a total area of 9km2. The hydraulic design process included 1D non-uniform flow modeling of three main watercourses, namely the Signal Mountain cutoff drain, the Pouce stream, the Ruisseau des Creoles stream and their feeding drains, corresponding to a total length of 6.3km, including the evaluation […]

Consultancy services for land drainage and water shed management study

This contract focuses on seven distinct areas of Mauritius, which have been identified as priority areas by the National Development Unit (NDU), namely: Grand Baie, Pamplemousses, Central Flacq, Cottage, Clemencia, Sebastopol, Gros Billot. The general objective is to evaluate the existing conditions, both within the flooding areas and the wider catchments, and identify the most […]

Water management project of river basins in the water districts of east macedonia and thrace according to specifications of the e.u. Directive 2000 /60/ec

The project concerned two out of the total fourteen River Basin Districts (RBDs) of Greece, Eastern Macedoniaand Thrace. The project is about the provision of services to complete and extend the outcomes of previous national actions leading up to the implementation of the EU Water Framework Directive (2000/60/EC) in these two RBDs and to the […]