Detailed design for the drainage of venetikos tunnel, egnatia motorway, grevena prefecture, west macedonia, north greece

Country: Greece
Client: -
Year: 2003 - 2004
Funding: -
Contract Value: -

Detailed design for the drainage of venetikos tunnel, egnatia motorway, grevena prefecture, west macedonia, north greece

Country: Greece
Client: -
Year: 2003 - 2004
Funding: -
Contract Value: -

The diverse terrain crossed by the Egnatia Motorway together with the special environmental conditions encountered imposed the construction (provision for) 73 twin-bore road tunnels of an overall combined length of 100km (measured as single carriageway) measured at 50km of single carriageway. Veneticos tunnel was a 700 m long double bored tunnel lying immediate afterwards the Veneticos Bridge. The hydraulic design included the following: (a) surface road drainage and (b) drainage system to prevent flooding from upstream catchment areas along with the design of the necessary hydraulic structures (ditches, culverts, etc).
Veneticos tunnel was a 700 m long double bored tunnel lying immediate afterwards the Veneticos Bridge. The hydraulic design included the following: (a)water drainage system of the Venetikos tunnel (b) drainage system to prevent flooding from upstream catchment areas along with the design of the necessary hydraulic structures (ditches, culverts, etc).

Modifications – completions of existing and new final designs for storm networks inside kifissos river drainage basin

Country: Greece
Client: -
Year: 2002 - 2009
Funding: -
Contract Value: -

Modifications – completions of existing and new final designs for storm networks inside kifissos river drainage basin

Country: Greece
Client: -
Year: 2002 - 2009
Funding: -
Contract Value: -

The project involved the detailed design studies for the upgrading and rehabilitation of storm water networks within the Kifissos River Drainage Basin covering a large part of the city of Athens. The following studies are the ones completed through the contract by Z&A: Detailed Design for Completion of the Existing Main Storm Network Pipe at Moschato, Kalithea and Nea Smyrni Areas on Eleftherias Street, Detailed Design for Discarding of Flood Projects in the General West Attica Hospital “Attikon”,Detailed Design for the Arrangement of Chaidari stream between the avenues Kavalas and Athinon, Peristeri Municipality, Detailed Design for the Main Storm Network Pipes of the Old Settlement in Acharnes Municipality.
The project involved the detailed design studies for the upgrading and rehabilitation of storm water networks within the Kifissos River Drainage Basin.The following studies are the ones completed through the contract by Z&A: Main Storm Network Pipe at Moschato, Kalithea and Nea Smyrni Areas on Eleftherias Street, Discarding of Flood Projects in the General West Attica Hospital “Attikon”, Realigment of Chaidari stream, Peristeri Municipality, Main Storm Network Pipes of Acharnes Municipality.

Final design of road drainage of p.a.th.E. Motorway during competion of construction at section ag. Theodoroi – almyros

Country: Greece
Client: -
Year: 1996 - 2002
Funding: -
Contract Value: -

Final design of road drainage of p.a.th.E. Motorway during competion of construction at section ag. Theodoroi – almyros

Country: Greece
Client: -
Year: 1996 - 2002
Funding: -
Contract Value: -

This study concerned the re-evaluation of the detailed design study of the water drainage system at the part of the national motorway from Ag. Tehodoroi junction to Almiros junction. Z&A carried out all the final hydraulic study of water drainage system for the construction of Patra – Athens – Thessalonica – Evzonoi motorway at Ag. Theodoroi – Almyros section, including the interchanges. The need of Final Hydraulic Study resulted from the revision of Final Road Study during construction and the changes that occurred in the layout and hypsometric mapping of the motorway and the service roads. The hydraulic design included the following: (a) water drainage system of the motorway and the service roads (b) drainage system to prevent flooding from upstream catchment areas along with the design of the necessary hydraulic structures (ditches, culverts, etc).
This study concerned the re-evaluation of the detailed design study of the water drainage system at the part of the national motorway from Ag. Tehodoroi junction to Almiros junction. The hydraulic design included the following: (a) water drainage system of the motorway and the service roads (b) drainage system to prevent flooding from upstream catchment areas along with the design of the necessary hydraulic structures (ditches, culverts, etc).

Detailed design for the drainage of egnatia’s motorway vertical axis siatista – kristallopigi, macedonia, north greece

Country: Greece
Client: -
Year: 2003 - 2004
Funding: -
Contract Value: -

Detailed design for the drainage of egnatia’s motorway vertical axis siatista – kristallopigi, macedonia, north greece

Country: Greece
Client: -
Year: 2003 - 2004
Funding: -
Contract Value: -

The vertical axis Siatista – Ieropigi / Krystallopigi is part of the Trans-European Transport Network. It links Pogradec – Cafasan – Durres in the south of Albania and it is part of Pan-European Corridor VIII. It is being constructed as a dual carriageway with two traffic lanes and a hard shoulder per direction. The contract objective was the hydraulic design of the Koromilia – Ieropigi part with a length of 21 km. It involved the road surface drainage system and the flooding protection system from upstream catchment areas. Fourty three (43) culverts were designed for this last purpose.
The contract objective was the hydraulic design of the Koromilia – Ieropigi part with a length of 21 km. It involved the road surface drainage system and the flooding protection system from upstream catchment areas. Fourty three (43) culverts were designed for this last purpose.

Detailed design for the drainage of arachthos bridge, egnatia motorway, ipiros prefecture, west greece

Country: Greece
Client: -
Year: 2001 - 2004
Funding: -
Contract Value: -

Detailed design for the drainage of arachthos bridge, egnatia motorway, ipiros prefecture, west greece

Country: Greece
Client: -
Year: 2001 - 2004
Funding: -
Contract Value: -

Arachthos Bridge is the biggest bridge of Egnatia Motorway and one of the biggest in Europe. The scope of the study was the detailed design of the water drainage system of Arachthos Bridge, the flood protection system from upstream catchments along with the design of the necessary hydraulic structures (ditches, culverts, etc). The Arachthos Bridge has the following technical characteristics: Length of left and right carriageway: 1036 m, Number of spans:8, Maximum span length: 142 m, Maximum pier height: 30 m
Arachthos Bridge of Egnatia Motorway is one of the biggest in Europe. The scope of the study was the detailed design of the water drainage system of Arachthos Bridge, the flood protection system from upstream catchments along with the design of the necessary hydraulic structures (ditches, culverts, etc).

Modifications – completions of sewerage networks in the athens greater area (contract m-153)

Country: Greece
Client: -
Year: 2001 - 2006
Funding: -
Contract Value: -

Modifications – completions of sewerage networks in the athens greater area (contract m-153)

Country: Greece
Client: -
Year: 2001 - 2006
Funding: -
Contract Value: -

The project involved the detail design studies for the upgrading and rehabilitation of sewerage networks in the greater Athens area. It also included the tender phase documentation for sewerage networks.The following studies were completed through the contract: Detailed design of the sewerage network in Marousi Municipality area, Detailed design of the sewerage network in Neo Hrakleio Municipality area, Detailed design of the sewerage network in Agios Dimitrios Municipality area.
The project involved the detail design for the upgrading and rehabilitation of sewerage networks in the greater Athens area.The following studies were completed through the contract: Detailed design of the sewerage network in Marousi Municipality area, Detailed design of the sewerage network in Neo Hrakleio Municipality area, Detailed design of the sewerage network in Agios Dimitrios Municipality area.

Irrigation of p.a.th.E. Motorway at section from almyros to evagelismos villages, thessaly prefecture, central greece

Country: Greece
Client: -
Year: 2001 - 2003
Funding: -
Contract Value: -

Irrigation of p.a.th.E. Motorway at section from almyros to evagelismos villages, thessaly prefecture, central greece

Country: Greece
Client: -
Year: 2001 - 2003
Funding: -
Contract Value: -

The study concerned the detailed design of the irrigation system across the national motorway “Patra – Athens – Thessaloniki – Evzonon” in Almyros – Evagelismos section, that included the design of reservoirs and pumping stations, water resources management of drills and springs and the design of the irrigation water supply network and distribution. The total length of the under study section of the highway was about 90 km. Six (6) pumping stations with the nessecary wells and tanks were designed. A full scada system was designed for the automatic control of the irrigation network.
The study concerned the detailed design of the irrigation system across the national motorway “Patra – Athens – Thessaloniki – Evzonon” in Almyros – Evagelismos section, that included the design of reservoirs and pumping stations, water resources management of drills and springs and the design of the irrigation water supply network and distribution. The total length of the under study section of the highway was about 90 km.

Completion of hydraulic studies in the new double high speed railway line between towns kiato and patra, peloponnese, greece (i.d. 219)

Country: Greece
Client: -
Year: 2001 - 2004
Funding: -
Contract Value: -

Completion of hydraulic studies in the new double high speed railway line between towns kiato and patra, peloponnese, greece (i.d. 219)

Country: Greece
Client: -
Year: 2001 - 2004
Funding: -
Contract Value: -

The preliminary and detailed design of the water drainage system of the railway line from Athens to Patra and especially the part from STA 40+000 to STA 75+000, along with the service road drainage system, the flood protection system from surrounding catchment areas with the necessary hydraulic structures (ditches, culverts, etc). The contract also involved the restoration of the existing irrigation networks.
The preliminary and detailed design of a water drainage system of the railway line from Athens to Patra and especially the part from STA 40+000 to STA 75+000, along with the service road drainage system, the flood protection system from surrounding catchment areas with all the necessary hydraulic structures (ditches, culverts, etc) and the restoration of the existing irrigation networks.

Rehabilitation & modernization of springler irrigation networks in pinios and alfios rivers, prefecture of hleia, peloponesse, south greece

Country: Greece
Client: -
Year: 2000 - 2002
Funding: -
Contract Value: -

Rehabilitation & modernization of springler irrigation networks in pinios and alfios rivers, prefecture of hleia, peloponesse, south greece

Country: Greece
Client: -
Year: 2000 - 2002
Funding: -
Contract Value: -

The contract objective was the rehabilitation of five (5) irrigation networks of Pineios and Alfios rivers area (approximately 6,000.00 hectares), restructuring the irrigation supply networks, replacing and extending the distribution network along with the rehabilitation of the electrical engineering installations,the development of a scada system for the pumping stations and the environmental studies. For the needs of the design, a sophisticated hydraulic software was developed in house to implement the “Labye” method in an existing network and propose the most cost effective solution for the network rehabilitation. The project was implemented and the Consultant supported the Client during the construction.
The contract objective was the rehabilitation of five (5) irrigation networks of Pineios and Alfios rivers area (approximately 6,000 ha), restructuring the irrigation supply networks, replacing and extending the distribution network along with the rehabilitation of the electrical engineering installations,the development of a scada system for the pumping stations and the environmental studies.

Provision, installation and development of remote system management station for leakage detection of internal water supply network of kozani

Country: Greece
Client: -
Year: 2000 - 2001
Funding: -
Contract Value: -

Provision, installation and development of remote system management station for leakage detection of internal water supply network of kozani

Country: Greece
Client: -
Year: 2000 - 2001
Funding: -
Contract Value: -

Kozani is a city in Northern Greece with a population of 80.000 people. The project started with the development of a full GIS System of the entire network. The study included a description of the external and internal network system of the city and studied the method of identifying leaks from the existing data with the Service. A hydraulic network simulation model was developed, using the software EPANET2. The area was separated into 22 pressure zones and flow and pressure meters were installed. Field measurements were executed for the calibration of the model. A full telemetry and SCADA system was installed. With the use of the model and the measurements the most critical zones were defined. Site leak detection followed and covered about 30% of the total area. Training of the local staff of the client was done during the campaign. The GIS system and the hydraulic model were both connected with the SCADA system and all the information were transferred on real time basis to the Water Supply Authority’s headquarters.
Kozani is a city in Northern Greece with a population of 80.000 people. The project’s objective was the final study of Kozani’s water supply system including GIS modelling, installation of flow and pressure meters along with the SCADA system, field measurements, design of a replacement program for old valves and pipes, cost estimation, design of pressure management of the network, 24 hrs network monitoring, design of a new billing system and training of the local staff.