The overall objective of the study is to undertake a prefeasibility study covering the entire study area(19 sites) and to continue with feasibility studies and detailed designs of multiple land husbandry, dam and hillside irrigation schemes at selected sites with a total net area of 3,500 ha (total gross area of 4,200 ha). The sites […]
